Application of Artificial Neural Networks in Predicting Subbase CBR Values Using Soil Indices Data S Al-Busultan, GK Aswed, RRA Almuhanna, SE Rasheed IOP Conference Series: Materials Science and Engineering 671 (1), 012106, 2020 | 27 | 2020 |
PRODUCTIVITY ESTIMATION MODEL FOR BRACKLAYER IN CONSTRUCTION PROJECTS USING NEURAL NETWORK GK Aswed Al-Qadisiyah Journal For Engineering Sciences 9 (2), 183- 199, 2016 | 22 | 2016 |
Investigating factors affecting feasibility study of construction projects in Iraq MN Ahmed, HA Mohammed, GK Aswed, WSS Alyhya Periodicals of Engineering and Natural Sciences 7 (3), 1209-1217, 2019 | 8 | 2019 |
Modeling the water quality index and climate variables using an artificial neural network and non-linear regression SAADMGKA Layla Ali Mohammed Saleh International Journal of Engineering & Technology 7 (3), 1346-1350, 2018 | 7 | 2018 |
Forecasting the Final Cost of Iraqi Public School Projects Using Regression Analysis ZSM Khaled, QJ Frayyeh, GK Aswed | 7 | 2015 |
Forecasting construction time for road projects and infrastructure using the fuzzy PERT method ZK Nemaa, GK Aswed IOP conference series: materials science and engineering 1076 (1), 012123, 2021 | 6 | 2021 |
MODELING FINAL COSTS OF IRAQI PUBLIC SCHOOL PROJECTS USING NEURAL NETWORKS Zeyad S. M. Khaled,Qais Jawad Frayyeh, Gafel kareem aswed International Journal of Civil Engineering and Technology (IJCIET) http …, 2014 | 6* | 2014 |
Modeling Contractor’s Cash-in-Flow in Public School Building Projects in Karbala ZSM Khaled, GK Aswed Al-Nahrain Journal for Engineering Sciences 20 (5), 1064-1070, 2017 | 3 | 2017 |
Predicting initial duration of project using linear and nonlinear regression models MNAHAM Gafel Kareem Aswed International Journal of Advanced Technology and Engineering Exploration 9 …, 2022 | 2 | 2022 |
Factors Affecting Safety in Construction Projects MNA Gafel Kareem Aswed, Hussein Ali Mohammed International Review of Civil Engineering (I.RE.C.E.) 11 (3), 135, 2020 | 1* | 2020 |
A study into international infrastructure standards and their impact on Iraqi projects MAR Alwan, MN Ahmed, GK Aswed AIP Conference Proceedings 3079 (1), 2024 | | 2024 |
Decision-Making for Project Delivery System in Construction Projects Based on SWARA-TOPSIS Methods MN Ahmed, GK Aswed, HA Mohammed Tikrit Journal of Engineering Sciences 31 (1), 306-313, 2024 | | 2024 |
FORCASTING THE NUMBER OF BIDDERS IN THE IRAQI SCHOOL PROJECTS TENDERS HALIMMNA GAFEL KAREEM ASWED International Journal of Civil Engineering & Technology (IJCIET) 9 (11 …, 2018 | | 2018 |
Prediction Model for the Number of Work Stoppage days in Schools Projects in Provence of Baghdad بناء نموذج رياضي للتنبؤ بعدد أيام التوقف عن العمل في مشاريع المدارس في محافظة … GKAMNAA Ghanimi Albahir Journal 5 (No. 9 and 10), (97-110)A, 2017 | | 2017 |
Modeling Cost Overrun of Public Schools Projects G Kareem Aswed journal of kerbala university 12 (1), 102-111, 2016 | | 2016 |
Modeling Cost Overrun of Public Schools Projects GK Aswed Journal University of Kerbala 14 (No.3), 102-111, 2016 | | 2016 |
PREDICTING FINAL COST FOR SCHOOL BUILDING PROJECTS USING ARTIFICIAL NEURAL NETWORK AND MULTI REGRESSION TECHNIQUES GK Aswed https://www.iqthod.org/articles/20, 2014 | | 2014 |
Causes of Delay in Iraq Construction Projects G Ewadh, H. Ali and Aswed Journal of Babylon University/Science 4 (14), 483-495, 2007 | | 2007 |
FORCASTING THE NUMBER OF BIDDERS IN THE IRAQI SCHOOL PROJECTS TENDERS GK Aswed, HA Mohammed, MN Ahmed | | |
Modeling Contractor’s Cash-in-Flow in Public School Building Projects in Karbala GK Zeyad S. M. Khaled and Aswed AL-Nahrain journal for Eng. sci., 0 | | |