Empowering and engaging industrial workers with Operator 4.0 solutions E Kaasinen, F Schmalfuß, C Özturk, S Aromaa, M Boubekeur, J Heilala, ... Computers & Industrial Engineering 139, 105678, 2020 | 337 | 2020 |
Object detection at 200 frames per second R Mehta, C Ozturk Proceedings of the European Conference on Computer Vision (ECCV) Workshops, 0-0, 2018 | 85 | 2018 |
Cyclic scheduling of flexible mixed model assembly lines with parallel stations C Öztürk, S Tunali, B Hnich, A Ornek Journal of Manufacturing Systems 36, 147-158, 2015 | 42 | 2015 |
Balancing and scheduling of flexible mixed model assembly lines C Ozturk, S Tunali, B Hnich, MA Ornek Constraints 18 (3), 434-469, 2013 | 42 | 2013 |
Balancing and scheduling of flexible mixed model assembly lines with parallel stations C Öztürk, S Tunalı, B Hnich, A Örnek The International Journal of Advanced Manufacturing Technology 67, 2577-2591, 2013 | 34 | 2013 |
Capacitated lot sizing with linked lots for general product structures in job shops C Oztürk, AM Ornek Computers & Industrial Engineering 58 (1), 151-164, 2010 | 32 | 2010 |
Operational extended model formulations for advanced planning and scheduling systems C Öztürk, AM Ornek Applied Mathematical Modelling 38 (1), 181-195, 2014 | 31 | 2014 |
Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence-dependent setup times C Ozturk, S Tunali, B Hnich, AM Ornek Electronic Notes in Discrete Mathematics 36, 65-72, 2010 | 27 | 2010 |
Moreopt: A goal programming based movie recommender system E Inan, F Tekbacak, C Ozturk Journal of computational science 28, 43-50, 2018 | 26 | 2018 |
OPTIMISATION AND CONSTRAINT BASED HEURISTIC METHODS FOR ADVANCED PLANNING AND SCHEDULING SYSTEMS. C Ozturk, MA Ornek International Journal of Industrial Engineering 23 (1), 2016 | 23 | 2016 |
STTAR: a simheuristics-enabled scheme for multi-stakeholder coordination of aircraft turnaround operations M Tomasella, A Clare, YS Gök, D Guimarans, C Ozturk 2019 Winter Simulation Conference (WSC), 488-499, 2019 | 20 | 2019 |
User evaluation of industry 4.0 concepts for worker engagement S Aromaa, M Liinasuo, E Kaasinen, M Bojko, F Schmalfuß, ... Human Systems Engineering and Design: Proceedings of the 1st International …, 2019 | 20 | 2019 |
Constraint-based robust planning and scheduling of airport apron operations through simheuristics YS Gök, S Padrón, M Tomasella, D Guimarans, C Ozturk Annals of Operations Research 320 (2), 795-830, 2023 | 19 | 2023 |
A MIP based heuristic for capacitated MRP systems C Öztürk, AM Örnek Computers & Industrial Engineering 63 (4), 926-942, 2012 | 18 | 2012 |
Integer and constraint programming model formulations for flight-gate assignment problem MA Ornek, C Ozturk, I Sugut Operational Research 22 (1), 135-163, 2022 | 16 | 2022 |
A note on A mixed integer programming model for advanced planning and scheduling (APS) MA Örnek, S Özpeynirci, C Ozturk European Journal of Operatıonal Research, 2010 | 14 | 2010 |
A simheuristic approach for robust scheduling of airport turnaround teams YS Gök, M Tomasella, D Guimarans, C Ozturk 2020 Winter Simulation Conference (WSC), 1336-1347, 2020 | 13 | 2020 |
Robust resource planning for aircraft ground operations YS Gök, D Guimarans, PJ Stuckey, M Tomasella, C Ozturk Integration of Constraint Programming, Artificial Intelligence, and …, 2020 | 12 | 2020 |
Simulation-based optimization tool for field service planning GG Castañé, H Simonis, KN Brown, Y Lin, C Ozturk, M Garraffa, ... 2019 Winter Simulation Conference (WSC), 1684-1695, 2019 | 10 | 2019 |
Model-based heuristic for counter assignment problem with operational constrains: A case study MA Ornek, C Ozturk, I Sugut Journal of Air Transport Management 77, 57-64, 2019 | 8 | 2019 |