An implementation of smart contracts by integrating BIM and blockchain A Shojaei, I Flood, HI Moud, M Hatami, X Zhang Proceedings of the Future Technologies Conference (FTC) 2019: Volume 2, 519-527, 2020 | 100 | 2020 |
BIM and basic challenges associated with its definitions, interpretations and expectations B Abbasnejad, HI Moud International Journal of Engineering Research and Applications (IJERA) 3 (2 …, 2013 | 99 | 2013 |
A hybrid computational approach to estimate solar global radiation: an empirical evidence from Iran ES Mostafavi, SS Ramiyani, R Sarvar, HI Moud, SM Mousavi Energy 49, 204-210, 2013 | 79 | 2013 |
Construction delays in Iranian civil engineering projects: An approach to the financial security of construction business B Abbasnejad, H Izadi Moud Life Science Journal 10 (2), 2632-2637, 2013 | 40 | 2013 |
Using 360-degree interactive panoramas to develop virtual representation of construction sites RE Pereira, HI Moud, M Gheisari Trabajo presentado en Lean and Computing in Construction Congress (LC3) 1, 2017 | 37 | 2017 |
Quantitative Assessment of Proximity Risks Associated with Unmanned Aerial Vehicles in Construction H Izadi Moud, I Flood, X Zhang, B Abbasnejad, P Rahgozar, M McIntyre Journal of Management in Engineering 37 (1), 04020095-1-04020095-13, 2021 | 22 | 2021 |
Current and Future Applications of Unmanned Surface, Underwater, and Ground Vehicles in Construction HI Moud, A Shojaei, I Flood Construction Research Congress 2018, 106-115, 2018 | 19 | 2018 |
Qualitative and Quantitative Risk Analysis of Unmanned Aerial Vehicle Flights over Construction Job Sites HI Moud, A Shojaei, I Flood, X Zhang, M Hatami The Eighth International Conference on Advanced Communications and …, 2018 | 17 | 2018 |
Leadership Functions and Challenges in Virtual Teams-A Review Paper B Abbasnejad, HI Moud International Proceedings of Economics Development & Research 45, 2012 | 16 | 2012 |
Proof of Concept for the Use of Small Unmanned Surface Vehicle in Built Environment Management A Shojaei, HI Moud, I Flood Construction Research Congress 2018, 116-126, 2018 | 14 | 2018 |
Factors affecting knowledge transfer in project based organizations HI MOUD, B Abbasnejad 11th International Conference of the Asia Chapter & 2nd Conference of the …, 2012 | 13* | 2012 |
Modelling the key enablers of organizational building information modelling (BIM) implementation: An interpretive structural modelling (ISM) approach B Abbasnejad, MP Nepal, SA Mirhosseini, HI Moud, A Ahankoob Journal of Information Technology in Construction 26, 974-1008, 2021 | 11 | 2021 |
Qualitative assessment of indirect risks associated with Unmanned Aerial Vehicle flights over construction job sites HI Moud, I Flood, A Shojaei, Y Zhang, X Zhang, M Tadayon, M Hatami ASCE International Conference on Computing in Civil Engineering 2019, 83-89, 2019 | 11 | 2019 |
Qualitative and Quantitative Risk Analysis of Unmanned Aerial Vehicle Flights on Construction Job Sites: A Case Study H Izadi Moud, X Zhang, I Flood, A Shojaei, Y Zhang, C Capano International Journal on Advances in Intelligent Systems 12 (3 & 4), 135-146, 2019 | 9 | 2019 |
A cost model to evaluate the economic performance of contour crafting X Zhang, I Flood, Y Zhang, HI Moud, M Hatami ASCE International Conference on Computing in Civil Engineering 2019, 618-625, 2019 | 9 | 2019 |
Monte Carlo Based Risk Analysis of Unmanned Aerial Vehicle Flights over Construction Job Sites H Izadi Moud, A Shojaei, I Flood The 9th International Conference on Simulation & Modeling Methodologies …, 2018 | 9* | 2018 |
A flight simulator for unmanned aerial vehicle flights over construction job sites HI Moud, MA Razkenari, I Flood, C Kibert Advances in Informatics and Computing in Civil and Construction Engineering …, 2019 | 8 | 2019 |
Coupling wireless sensor networks and unmanned aerial vehicles in bridge health monitoring systems HI Moud, M Gheisari ISARC 2016–33rd International Symposium on Automation and Robotics in …, 2016 | 8 | 2016 |
Sustainability Assessment of Data Centers Beyond LEED H Izadi Moud, H Hakim, C Kibert, I Flood, J Hariharan IEEE Green Technologies, 2020 | 7* | 2020 |
Integrating BIM and Lean in the design phase HI Moud Chalmers University of Technology, Sweden, 2013 | 6 | 2013 |