关注
Krzysztof Zima
Krzysztof Zima
在 izwbit.pk.edu.pl 的电子邮件经过验证
标题
引用次数
引用次数
年份
Cost calculation of construction projects including sustainability factors using the Case Based Reasoning (CBR) method
A Leśniak, K Zima
Sustainability 10 (5), 1608, 2018
1152018
Fuzzy AHP application for supporting contractors’ bidding decision
A Leśniak, D Kubek, E Plebankiewicz, K Zima, S Belniak
Symmetry 10 (11), 642, 2018
932018
A SWOT analysis of the use of BIM technology in the polish construction industry
K Zima, E Plebankiewicz, D Wieczorek
Buildings 10 (1), 16, 2020
882020
ANN based approach for estimation of construction costs of sports fields
M Juszczyk, A Leśniak, K Zima
Complexity 2018 (1), 7952434, 2018
792018
Life cycle cost modelling of buildings with consideration of the risk
E Plebankiewicz, K Zima, D Wieczorek
Archives of Civil Engineering 62 (2), 2016
712016
Analysis of the first Polish BIM-Based cost estimation application
E Plebankiewicz, K Zima, M Skibniewski
Procedia Engineering 123, 405-414, 2015
682015
Scan-to-BIM method in construction: assessment of the 3D buildings model accuracy in terms inventory measurements
I Skrzypczak, G Oleniacz, A Leśniak, K Zima, M Mrówczyńska, JK Kazak
Building Research & Information 50 (8), 859-880, 2022
602022
Prospects for the use of BIM in Poland and the Czech Republic–Preliminary research results
M Juszczyk, M Výskala, K Zima
Procedia Engineering 123, 250-259, 2015
552015
Errors in the preparation of design documentation in public procurement in Poland
M Juszczyk, R Kozik, A Leśniak, E Plebankiewicz, K Zima
Procedia Engineering 85, 283-292, 2014
542014
The influence of the building shape on the costs of its construction
S Belniak, A Leśniak, E Plebankiewicz, K Zima
Journal of Financial Management of Property and Construction 18 (1), 90-102, 2013
502013
The case-based reasoning model of cost estimation at the preliminary stage of a construction project
K Zima
Procedia Engineering 122, 57-64, 2015
492015
Design and build procurement system–contractor selection
A Leśniak, E Plebankiewicz, K Zima
Archives of Civil Engineering 58 (4), 463-476, 2012
472012
Impact of information included in the BIM on preparation of Bill of Quantities
K Zima
Procedia engineering 208, 203-210, 2017
452017
Forecasting of sports fields construction costs aided by ensembles of neural networks
M Juszczyk, K Zima, W Lelek
Journal of Civil Engineering and Management 25 (7), 715-729, 2019
392019
Evaluation of planned construction projects using fuzzy logic
M Gajzler, K Zima
International Journal of Civil Engineering 15, 641-652, 2017
392017
Model estimation of the whole life cost of a building with respect to risk factors
D Wieczorek, E Plebankiewicz, K Zima
Technological and Economic Development of Economy 25 (1), 20-38, 2019
332019
Probabilistic and fuzzy approaches for estimating the life cycle costs of buildings under conditions of exposure to risk
E Plebankiewicz, W Meszek, K Zima, D Wieczorek
Sustainability 12 (1), 226, 2019
312019
Comparison of traditional and ecological wall systems using the AHP method
A Lesniak, K Zima
15th International Multidisciplinary Scientific GeoConference SGEM 2015, 157-164, 2015
302015
Modelling of time, cost and risk of construction with using fuzzy logic
E Plebankiewicz, K Zima, D Wieczorek
Journal of Civil Engineering and Management 27 (6), 412-426, 2021
292021
Quantification of the risk addition in life cycle cost of a building object
E Plebankiewicz, K Zima, D Wieczorek
Technical Transactions 114 (5), 35-45, 2017
232017
系统目前无法执行此操作,请稍后再试。
文章 1–20