关注
Erinc Albey
Erinc Albey
Assistant Professor of Industrial Engineering, Özyeğin University
在 ozyegin.edu.tr 的电子邮件经过验证
标题
引用次数
引用次数
年份
Demand modeling with forecast evolution: an application to production planning
E Albey, A Norouzi, KG Kempf, R Uzsoy
IEEE Transactions on Semiconductor Manufacturing 28 (3), 374-384, 2015
632015
A hierarchical approach to FMS planning and control with simulation-based capacity anticipation
E Albey, Ü Bilge
International Journal of Production Research 49 (11), 3319-3342, 2011
502011
An exploratory study of disaggregated clearing functions for production systems with multiple products
E Albey, Ü Bilge, R Uzsoy
International Journal of Production Research 52 (18), 5301-5322, 2014
452014
A parametric fuzzy logic approach to dynamic part routing under full routing flexibility
Ü Bilge, M Fırat, E Albey
Computers & Industrial Engineering 55 (1), 15-33, 2008
442008
Multi-dimensional clearing functions for aggregate capacity modelling in multi-stage production systems
E Albey, Ü Bilge, R Uzsoy
International Journal of Production Research 55 (14), 4164-4179, 2017
322017
The impact of lot-sizing in multiple product environments with congestion
Y Kang, E Albey, S Hwang, R Uzsoy
Journal of Manufacturing Systems 33 (3), 436-444, 2014
292014
Lead time modeling in production planning
E Albey, R Uzsoy
2015 Winter Simulation Conference (WSC), 1996-2007, 2015
162015
Optimal pricing and inventory strategies for fashion products under time-dependent interest rate and demand
M Akan, E Albey, MG Güler
Computers & Industrial Engineering 154, 107149, 2021
132021
A chance constraint based multi-item production planning model using simulation optimization
E Albey, R Uzsoy, KG Kempf
2016 Winter Simulation Conference (WSC), 2719-2730, 2016
112016
Rounding heuristics for multiple product dynamic lot-sizing in the presence of queueing behavior
Y Kang, E Albey, R Uzsoy
Computers & Operations Research 100, 54-65, 2018
92018
Ensemble Learning based on Regressor Chains: A Case on Quality Prediction.
KC Demirel, A Sahin, E Albey
DATA, 267-274, 2019
72019
Load dependent lead time modelling: A robust optimization approach
E Albey, İ Yanıkoğlu, R Uzsoy
2017 Winter Simulation Conference (WSC), 3531-3542, 2017
72017
A data-driven matching algorithm for ride pooling problem
A Şahin, İ Sevim, E Albey, MG Güler
Computers & Operations Research 140, 105666, 2022
62022
A CART-based Genetic Algorithm for Constructing Higher Accuracy Decision Trees.
E Ersoy, E Albey, E Kayis
DATA, 328-338, 2020
62020
Çevik yöntemlerde cosmic i̇şlev puanı ve hikaye puanının birlikte kullanımı
C Ertaban, S Gezgin, S Bağrıyanık, E Albey, A Karahoca
CEUR Workshop Proceedings, 2017
62017
Mathematical models for FMS loading and part type selection with flexible process plans
Ü Bilge, E Albey, U Beşikci, K Erbatur, AN Arslan
European Journal of Industrial Engineering 9 (2), 171-194, 2015
62015
Economic lot sizing problem with inventory dependent demand
M Önal, E Albey
Optimization Letters 14 (8), 2087-2106, 2020
52020
Churn Prediction for Mobile Prepaid Subscribers.
Z Can, E Albey
DATA, 67-74, 2017
52017
Robust parameter design and optimization for quality engineering
İ Yanıkoğlu, E Albey, S Okçuoğlu
Operations Research Forum 3 (1), 8, 2022
42022
A hierarchical approach for solving simultaneous lot sizing and scheduling problem with secondary resources
CU Şafak, G Yılmaz, E Albey
IFAC-PapersOnLine 52 (13), 1931-1936, 2019
42019
系统目前无法执行此操作,请稍后再试。
文章 1–20