Vertical cooperative advertising and pricing decisions in a manufacturer-retailer supply chain: A game-theoretic approach G Aust, U Buscher European Journal of Operational Research 223 (2), 473-482, 2012 | 247 | 2012 |
Cooperative advertising models in supply chain management: A review G Aust, U Buscher European Journal of Operational Research 234 (1), 1-14, 2014 | 236 | 2014 |
A comprehensive review of flowshop group scheduling literature JS Neufeld, JND Gupta, U Buscher Computers & Operations Research 70, 56-74, 2016 | 123 | 2016 |
A branch-and-cut algorithm for the vehicle routing problem with drones F Tamke, U Buscher Transportation Research Part B: Methodological 144, 174-203, 2021 | 113 | 2021 |
Optimizing a production system with rework and equal sized batch shipments U Buscher, G Lindner Computers & Operations Research 34 (2), 515-535, 2007 | 110 | 2007 |
Single row layout models B Keller, U Buscher European Journal of Operational Research 245 (3), 629-644, 2015 | 106 | 2015 |
Solving the serial batching problem in job shop manufacturing systems L Shen, U Buscher European Journal of Operational Research 221 (1), 14-26, 2012 | 102 | 2012 |
A multi-objective iterated local search algorithm for comprehensive energy-aware hybrid flow shop scheduling S Schulz, JS Neufeld, U Buscher Journal of cleaner production 224, 421-434, 2019 | 100 | 2019 |
Railway crew scheduling: Models, methods and applications J Heil, K Hoffmann, U Buscher European journal of operational research 283 (2), 405-425, 2020 | 97 | 2020 |
ZP-Stichwort: Supply chain management U Buscher Zeitschrift für Planung 10 (4), 449-456, 1999 | 68 | 1999 |
An integrated tabu search algorithm for the lot streaming problem in job shops U Buscher, L Shen European Journal of Operational Research 199 (2), 385-399, 2009 | 65 | 2009 |
Optimizing multi-stage production with constant lot size and varying number of unequal sized batches RW Bogaschewsky, UD Buscher, G Lindner Omega 29 (2), 183-191, 2001 | 65 | 2001 |
Energy aware scheduling in flexible flow shops with hybrid particle swarm optimization J Ding, S Schulz, L Shen, U Buscher, Z Lü Computers & Operations Research 125, 105088, 2021 | 62 | 2021 |
Multi-objective hybrid flow shop scheduling with variable discrete production speed levels and time-of-use energy prices S Schulz, U Buscher, L Shen Journal of Business Economics 90, 1315-1343, 2020 | 51 | 2020 |
Verrechnungspreise aus organisations-und agencytheoretischer Sicht U Buscher Springer-Verlag, 2013 | 50 | 2013 |
A systematic review of multi-objective hybrid flow shop scheduling JS Neufeld, S Schulz, U Buscher European Journal of Operational Research 309 (1), 1-23, 2023 | 47 | 2023 |
Vertical cooperative advertising in a retailer duopoly G Aust, U Buscher Computers & Industrial Engineering 72, 247-254, 2014 | 46 | 2014 |
Valid inequalities for the arc flow formulation of the railway crew scheduling problem with attendance rates K Hoffmann, U Buscher Computers & Industrial Engineering 127, 1143-1152, 2019 | 37 | 2019 |
The vehicle routing problem with drones and drone speed selection F Tamke, U Buscher Computers & Operations Research 152, 106112, 2023 | 36 | 2023 |
Solving practical railway crew scheduling problems with attendance rates K Hoffmann, U Buscher, JS Neufeld, F Tamke Business & Information Systems Engineering 59 (3), 147-159, 2017 | 36 | 2017 |