关注
Ziqiang Zeng
Ziqiang Zeng
Associate Professor of Management Science and System Science, Sichuan University
在 scu.edu.cn 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Discrete time–cost–environment trade-off problem for large-scale construction systems with multiple modes under fuzzy uncertainty and its application to Jinping-II …
J Xu, H Zheng, Z Zeng, S Wu, M Shen
International Journal of Project Management 30 (8), 950-966, 2012
1342012
Bilevel optimization of regional water resources allocation problem under fuzzy random environment
J Xu, Y Tu, Z Zeng
Journal of Water Resources Planning and Management 139 (3), 246-264, 2013
1102013
Antithetic method‐based particle swarm optimization for a queuing network problem with fuzzy data in concrete transportation systems
Z Zeng, J Xu, S Wu, M Shen
Computer‐Aided Civil and Infrastructure Engineering 29 (10), 771-800, 2014
712014
Identification of significant factors in fatal-injury highway crashes using genetic algorithm and neural network
Y Li, D Ma, M Zhu, Z Zeng, Y Wang
Accident Analysis & Prevention 111, 354-363, 2018
682018
Carbon tax incentive policy towards air passenger transport carbon emissions reduction
R Qiu, J Xu, H Xie, Z Zeng, C Lv
Transportation Research Part D: Transport and Environment 85, 102441, 2020
612020
Integrating equality and stability to resolve water allocation issues with a multiobjective bilevel programming model
Z Hu, C Wei, L Yao, C Li, Z Zeng
Journal of Water Resources Planning and Management 142 (7), 04016013, 2016
542016
Carbon emission allowance allocation with a mixed mechanism in air passenger transport
R Qiu, J Xu, Z Zeng
Journal of environmental management 200, 204-216, 2017
512017
GIS-modelling based coal-fired power plant site identification and selection
J Xu, X Song, Y Wu, Z Zeng
Applied energy 159, 520-539, 2015
502015
A generalized nonlinear model-based mixed multinomial logit approach for crash data analysis
Z Zeng, W Zhu, R Ke, J Ash, Y Wang, J Xu, X Xu
Accident Analysis & Prevention 99, 51-65, 2017
472017
Equilibrium strategy based coal blending method for combined carbon and PM10 emissions reductions
C Lv, J Xu, H Xie, Z Zeng, Y Wu
Applied energy 183, 1035-1052, 2016
452016
A multiple objective decision making model for energy generation portfolio under fuzzy uncertainty: Case study of large scale investor-owned utilities in Florida
Z Zeng, E Nasri, A Chini, R Ries, J Xu
Renewable Energy 75, 224-242, 2015
362015
A dynamic programming-based particle swarm optimization algorithm for an inventory management problem under uncertainty
J Xu, Z Zeng, B Han, X Lei
Engineering Optimization 45 (7), 851-880, 2013
352013
Applying optimal control model to dynamic equipment allocation problem: case study of concrete-faced rockfill dam construction project
J Xu, Z Zeng
Journal of construction engineering and management 137 (7), 536-550, 2011
332011
Carbon pricing initiatives-based bi-level pollution routing problem
R Qiu, J Xu, R Ke, Z Zeng, Y Wang
European Journal of Operational Research 286 (1), 203-217, 2020
302020
A decision making system for construction temporary facilities layout planning in large-scale construction projects
X Song, J Xu, C Shen, F Pena-Mora, Z Zeng
International journal of civil engineering 15, 333-353, 2017
292017
Chinese industrial outward FDI location choice in ASEAN countries
S Ma, X Xu, Z Zeng, L Wang
Sustainability 12 (2), 674, 2020
272020
Equilibrium strategy-based optimization method for the coal-water conflict: A perspective from China
J Xu, C Lv, M Zhang, L Yao, Z Zeng
Journal of Environmental Management 160, 312-323, 2015
242015
A Nonlinear Multiobjective Bilevel Model for Minimum Cost Network Flow Problem in a Large‐Scale Construction Project
J Xu, Y Tu, Z Zeng
Mathematical Problems in Engineering 2012 (1), 463976, 2012
242012
Data-driven solutions to transportation problems
Y Wang, Z Zeng
Elsevier, 2018
212018
A discrete time optimal control model with uncertainty for dynamic machine allocation problem and its application to manufacturing and construction industries
J Xu, Z Zeng
Applied Mathematical Modelling 36 (8), 3513-3544, 2012
202012
系统目前无法执行此操作,请稍后再试。
文章 1–20