No-wait flowshop scheduling problem with two criteria; total tardiness and makespan A Allahverdi, H Aydilek, A Aydilek European Journal of Operational Research 269 (2), 590-601, 2018 | 73 | 2018 |
No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan A Allahverdi, H Aydilek, A Aydilek Applied Mathematics and Computation 365, 124688, 2020 | 48 | 2020 |
Production in a two-machine flowshop scheduling environment with uncertain processing and setup times to minimize makespan A Aydilek, H Aydilek, A Allahverdi International Journal of Production Research 53 (9), 2803-2819, 2015 | 46 | 2015 |
Single machine scheduling problem with interval processing times to minimize mean weighted completion time A Allahverdi, H Aydilek, A Aydilek Computers & Operations Research 51, 200-207, 2014 | 45 | 2014 |
Increasing the profitability and competitiveness in a production environment with random and bounded setup times A Aydilek, H Aydilek, A Allahverdi International Journal of Production Research 51 (1), 106-117, 2013 | 36 | 2013 |
Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times A Aydilek, H Aydilek, A Allahverdi Applied mathematical modelling 45, 982-996, 2017 | 32 | 2017 |
Two-stage assembly scheduling problem for minimizing total tardiness with setup times A Allahverdi, H Aydilek, A Aydilek Applied mathematical modelling 40 (17-18), 7796-7815, 2016 | 32 | 2016 |
Types of banking institutions and economic growth K Elmawazini, KA Khiyar, A Aydilek International Journal of Islamic and Middle Eastern Finance and Management …, 2020 | 23 | 2020 |
Minimising maximum tardiness in assembly flowshops with setup times A Aydilek, H Aydilek, A Allahverdi International Journal of Production Research 55 (24), 7541-7565, 2017 | 18 | 2017 |
Minimizing the number of tardy jobs on a two-stage assembly flowshop A Allahverdi, A Aydilek, H Aydilek Journal of Industrial and Production Engineering 33 (6), 391-403, 2016 | 18 | 2016 |
More effective heuristics for a two-machine no-wait flowshop to minimize maximum lateness H Aydilek, A Aydilek, M Allahverdi, A Allahverdi International Journal of Industrial Engineering Computations 13 (4), 2022 | 13 | 2022 |
Habit formation and housing over the life cycle A Aydilek Economic Modelling 33, 858-866, 2013 | 13 | 2013 |
An algorithm for a no-wait flowshop scheduling problem for minimizing total tardiness with a constraint on total completion time A Allahverdi, H Aydilek, A Aydilek International Journal of Industrial Engineering Computations 13 (1), 43-50, 2022 | 11 | 2022 |
A better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measure M Allahverdi, H Aydilek, A Aydilek, A Allahverdi Journal of Industrial & Management Optimization 17 (4), 1973-1991, 2021 | 10 | 2021 |
An optimization model of retiree decisions under recursive utility with housing A Aydilek, H Aydilek Journal of Economics and Finance 44 (2), 258-277, 2020 | 7 | 2020 |
The allocation of time and puzzling profiles of the elderly A Aydilek Economic Modelling 53, 515-526, 2016 | 6 | 2016 |
Algorithms to minimize total completion time in a two-machine flowshop problem with uncertain set-up times H Aydilek, A Aydilek, A Allahverdi Engineering Optimization 53 (8), 1417-1430, 2021 | 5 | 2021 |
Do we really need heterogeneous agent models? H Aydilek, A Aydilek The Quarterly Review of Economics and Finance 78, 147-153, 2020 | 5 | 2020 |
Parameter interchangeability under recursive utility with housing A Aydilek, H Aydilek Journal of Economics and Finance 42, 807-817, 2018 | 3 | 2018 |
Insider trading with product differentiation W Daher, H Aydilek, F Karam, A Aydilek Journal of Economics 111 (2), 173-201, 2014 | 3 | 2014 |