A routing and scheduling problem for cross-docking networks with perishable products, heterogeneous vehicles and split delivery R Shahabi-Shahmiri, S Asian, R Tavakkoli-Moghaddam, SM Mousavi, ... Computers & industrial engineering 157, 107299, 2021 | 41 | 2021 |
A new approach for production project scheduling with time-cost-quality trade-off considering multi-mode resource-constraints under interval uncertainty M Ghasemi, SM Mousavi, S Aramesh, R Shahabi-Shahmiri, ... International Journal of Production Research 61 (9), 2963-2985, 2023 | 11 | 2023 |
Sustainable project portfolio selection and optimization with considerations of outsourcing decisions, financing options and staff assignment under interval type-2 fuzzy … V Mohagheghi, SM Mousavi, R Shahabi-Shahmiri Neural Computing and Applications 34 (17), 14577-14598, 2022 | 11 | 2022 |
An optimization model for construction project scheduling by considering CO2 emissions with multi-mode resource constraints under interval-valued fuzzy uncertainty S Aramesh, SM Mousavi, M Ghasemi, R Shahabi-Shahmiri International Journal of Environmental Science and Technology 20 (1), 87-102, 2023 | 8 | 2023 |
An integrated chance-constrained stochastic model for a preemptive multi-skilled multi-mode resource-constrained project scheduling problem: a case study of building a sports … SA Mirnezami, R Tavakkoli-Moghaddam, R Shahabi-Shahmiri, ... Engineering Applications of Artificial Intelligence 126, 106726, 2023 | 3 | 2023 |
A chance-constrained programming method with credibility measure for solving the multi-skill multi-mode resource-constrained project scheduling problem M Ghasemi, RK Chakrabortty, R Shahabi-Shahmiri, SA Mirnezami International Journal of Construction Management 24 (10), 1090-1106, 2024 | 1 | 2024 |
Multi-skill resource-constrained project scheduling problem considering overlapping: fuzzy multi-objective programming approach to a case study F Zarei, M Arashpour, SA Mirnezami, R Shahabi-Shahamiri, M Ghasemi International Journal of Construction Management 24 (8), 820-833, 2024 | 1 | 2024 |
A robust chance-constrained programming approach for a bi-objective pre-emptive multi-mode resource-constrained project scheduling problem with time crashing R Shahabi-Shahmiri, TS Kyriakidis, M Ghasemi, SA Mirnezami, S Mirjalili International Journal of Systems Science: Operations & Logistics 10 (1), 2253147, 2023 | | 2023 |
A Fuzzy Location-Allocation Problem for Sustainable Design of a Municipal Solid Waste Management Network SA Mirnezami, A Siadat, R Shahabi Journal of Quality Engineering and Production Optimization 5 (1), 165-188, 2020 | | 2020 |