Work flow variation and labor productivity: Case study M Liu, G Ballard, W Ibbs Journal of management in engineering 27 (4), 236-242, 2011 | 175 | 2011 |
Impact of change’s timing on labor productivity W Ibbs Journal of construction engineering and management 131 (11), 1219-1223, 2005 | 171 | 2005 |
Quantified impacts of project change W Ibbs, LD Nguyen, S Lee Journal of Professional Issues in Engineering Education and Practice 133 (1 …, 2007 | 169 | 2007 |
Construction change: Likelihood, severity, and impact on productivity W Ibbs Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2012 | 123 | 2012 |
Improved measured mile analysis technique W Ibbs, M Liu Journal of construction engineering and management 131 (12), 1249-1256, 2005 | 68 | 2005 |
Schedule analysis under the effect of resource allocation W Ibbs, LD Nguyen Journal of construction engineering and management 133 (2), 131-138, 2007 | 67 | 2007 |
Analysis of adverse weather for excusable delays LD Nguyen, J Kneppers, B García de Soto, W Ibbs Journal of construction engineering and management 136 (12), 1258-1267, 2010 | 59 | 2010 |
Alternative methods for choosing an appropriate project delivery system (PDS) W Ibbs, YY Chih Facilities 29 (13/14), 527-541, 2011 | 51 | 2011 |
Design and construction coordination problems and planning for design–build project new users AS Chang, FY Shen, W Ibbs Canadian journal of civil engineering 37 (12), 1525-1534, 2010 | 50 | 2010 |
FLORA: New forensic schedule analysis technique LD Nguyen, W Ibbs Journal of Construction Engineering and Management 134 (7), 483-491, 2008 | 49 | 2008 |
Concurrent delays and apportionment of damages W Ibbs, LD Nguyen, L Simonian Journal of Construction Engineering and Management 137 (2), 119-126, 2011 | 45 | 2011 |
Weather’s effect on construction labor productivity W Ibbs, X Sun Journal of legal affairs and dispute resolution in engineering and …, 2017 | 32 | 2017 |
Change and the loss of productivity in construction: a field guide W Ibbs, C Vaughan University of California, Berkley. US Available online at http …, 2015 | 29 | 2015 |
System dynamic modeling of delay and disruption claims W Ibbs, M Liu Cost Engineering 47 (6), 12, 2005 | 29 | 2005 |
System model for analyzing design productivity AS Chang, W Ibbs Journal of Management in Engineering 22 (1), 27-34, 2006 | 28 | 2006 |
The cumulative effect of change orders on labour productivity: The Leonard Study “Reloaded” G McEniry, W Ibbs The Revay Rep 26 (1), 1-8, 2007 | 24 | 2007 |
Evaluating the cumulative impact of changes on labor productivity W Ibbs, G McEniry, C PSP Cost Engineering 50 (12), 23-29, 2008 | 19 | 2008 |
Proactive project change-prediction tool W Ibbs, C Chen Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2015 | 18 | 2015 |
Thinking about delay, disruption, and the cumulative impact of multiple changes W Ibbs Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2013 | 16 | 2013 |
Measured-mile principles W Ibbs Journal of Legal Affairs and Dispute Resolution in Engineering and …, 2012 | 14 | 2012 |