关注
Mohammed Algahtany
Mohammed Algahtany
Northern Border University
在 nbu.edu.sa 的电子邮件经过验证
标题
引用次数
引用次数
年份
Owners’ perspective of factors contributing to project delay: case studies of road and bridge projects in Saudi Arabia
GSA Elawi, M Algahtany, D Kashiwagi
Procedia Engineering 145, 1402-1409, 2016
1322016
Introducing a new risk management model to the Saudi Arabian construction industry
M Algahtany, Y Alhammadi, D Kashiwagi
Procedia Engineering 145, 940-947, 2016
542016
Major factors causing construction delays in Mecca
GSA Elawi, M Algahtany, D Kashiwagi, K Sullivan
Journal for the Advancement of Performance Information and Value 7 (1), 75-75, 2015
522015
Construction 4.0 technologies and decision-making: A systematic review and gap analysis
H Shafei, AR Radzi, M Algahtany, RA Rahman
Buildings 12 (12), 2206, 2022
192022
The Current State of Research and Development Approach (R&D) in the Saudi Construction Industry
Y Alhammadi, M Algahtany, D Kashiwagi, K Sullivan, J Kashiwagi
Procedia Engineering 145, 1462-1469, 2016
122016
The assessment of Saudi Arabian contractors' classification system and other worldwide systems
S Almutairi, M Algahtany, J Kashiwagi, D Kashiwagi, K Sullivan, ...
Middle East Journal of Management 5 (2), 89-104, 2018
52018
Impacts and response strategies of the COVID-19 pandemic on the construction industry using structural equation modeling
MA Kassem, AR Radzi, A Pradeep, M Algahtany, RA Rahman
Sustainability 15 (3), 2672, 2023
42023
Government initiatives for enhancing building information modeling adoption in Saudi Arabia
M Algahtany, AR Radzi, MS Al-Mohammad, RA Rahman
Buildings 13 (9), 2130, 2023
32023
Factors affecting cost overrun in construction projects
M Algahtany
Proc. Int. Struct. Eng. Constr 8 (1), 2021
32021
The status of the Saudi construction industry during the COVID-19 pandemic
S Almutairi, M Bakri, AA AlMunifi, M Algahtany, S Aldalbahy
Sustainability 15 (21), 15432, 2023
22023
Procedures and issues within the contractors classification system in Saudi Arabia
S Almutairi, DT Kashiwagi, JS Kashiwagi, M Algahtany, K Sullivan
Journal for the Advancement of Performance Information and Value 9 (2), 79-85, 2017
22017
Improving the current procurement system in Saudi Arabia: A university case study
M Alzara, M Algahtany, JS Kashiwagi, A Al-Tassan
Editorial Board, 63, 2017
22017
Challenges in construction readiness for BIM-based building projects
AR Radzi, NF Azmi, SN Kamaruzzaman, M Algahtany, RA Rahman
Journal of Asian Architecture and Building Engineering, 1-16, 2024
12024
Modeling the factors affecting workplace well-being at construction sites: a cross-regional multigroup analysis
AR Radzi, A KS, AR Alias, M Algahtany, RA Rahman
Journal of Engineering, Design and Technology, 2024
12024
Key factors contributing to material waste in construction projects in the Northern Border Province, Saudi Arabia
M Algahtany
Journal of The North for Basic and Applied Sciences., 2023
2023
Assessment and Development of Contractors’ Mitigation Practices Towards Risks out of Contractors’ Control in the Saudi Construction Industry
M Algahtany
Arizona State University, 2018
2018
Assessment of contractors’ practices towards risks out of contractors control in construction industry
M Algahtany, D Kashiwagi, K Sullivan, J Kashiwagi, M Alzara
Proceedings of International Structural Engineering and Construction 5 (1 …, 2018
2018
Development of contractors’ mitigation practices towards risks out of contractors’ control in construction industry
M Algahtany, K Sullivan, D Kashiwagi, J Kashiwagi
Proceedings of International Structural Engineering and Construction 5 (1 …, 2018
2018
Identification and Assessment of Risks out of Contractors’ Control in the Saudi Construction Industry
M Algahtany
系统目前无法执行此操作,请稍后再试。
文章 1–19