Owners’ perspective of factors contributing to project delay: case studies of road and bridge projects in Saudi Arabia GSA Elawi, M Algahtany, D Kashiwagi Procedia Engineering 145, 1402-1409, 2016 | 132 | 2016 |
Introducing a new risk management model to the Saudi Arabian construction industry M Algahtany, Y Alhammadi, D Kashiwagi Procedia Engineering 145, 940-947, 2016 | 54 | 2016 |
Major factors causing construction delays in Mecca GSA Elawi, M Algahtany, D Kashiwagi, K Sullivan Journal for the Advancement of Performance Information and Value 7 (1), 75-75, 2015 | 52 | 2015 |
Construction 4.0 technologies and decision-making: A systematic review and gap analysis H Shafei, AR Radzi, M Algahtany, RA Rahman Buildings 12 (12), 2206, 2022 | 19 | 2022 |
The Current State of Research and Development Approach (R&D) in the Saudi Construction Industry Y Alhammadi, M Algahtany, D Kashiwagi, K Sullivan, J Kashiwagi Procedia Engineering 145, 1462-1469, 2016 | 12 | 2016 |
The assessment of Saudi Arabian contractors' classification system and other worldwide systems S Almutairi, M Algahtany, J Kashiwagi, D Kashiwagi, K Sullivan, ... Middle East Journal of Management 5 (2), 89-104, 2018 | 5 | 2018 |
Impacts and response strategies of the COVID-19 pandemic on the construction industry using structural equation modeling MA Kassem, AR Radzi, A Pradeep, M Algahtany, RA Rahman Sustainability 15 (3), 2672, 2023 | 4 | 2023 |
Government initiatives for enhancing building information modeling adoption in Saudi Arabia M Algahtany, AR Radzi, MS Al-Mohammad, RA Rahman Buildings 13 (9), 2130, 2023 | 3 | 2023 |
Factors affecting cost overrun in construction projects M Algahtany Proc. Int. Struct. Eng. Constr 8 (1), 2021 | 3 | 2021 |
The status of the Saudi construction industry during the COVID-19 pandemic S Almutairi, M Bakri, AA AlMunifi, M Algahtany, S Aldalbahy Sustainability 15 (21), 15432, 2023 | 2 | 2023 |
Procedures and issues within the contractors classification system in Saudi Arabia S Almutairi, DT Kashiwagi, JS Kashiwagi, M Algahtany, K Sullivan Journal for the Advancement of Performance Information and Value 9 (2), 79-85, 2017 | 2 | 2017 |
Improving the current procurement system in Saudi Arabia: A university case study M Alzara, M Algahtany, JS Kashiwagi, A Al-Tassan Editorial Board, 63, 2017 | 2 | 2017 |
Challenges in construction readiness for BIM-based building projects AR Radzi, NF Azmi, SN Kamaruzzaman, M Algahtany, RA Rahman Journal of Asian Architecture and Building Engineering, 1-16, 2024 | 1 | 2024 |
Modeling the factors affecting workplace well-being at construction sites: a cross-regional multigroup analysis AR Radzi, A KS, AR Alias, M Algahtany, RA Rahman Journal of Engineering, Design and Technology, 2024 | 1 | 2024 |
Key factors contributing to material waste in construction projects in the Northern Border Province, Saudi Arabia M Algahtany Journal of The North for Basic and Applied Sciences., 2023 | | 2023 |
Assessment and Development of Contractors’ Mitigation Practices Towards Risks out of Contractors’ Control in the Saudi Construction Industry M Algahtany Arizona State University, 2018 | | 2018 |
Assessment of contractors’ practices towards risks out of contractors control in construction industry M Algahtany, D Kashiwagi, K Sullivan, J Kashiwagi, M Alzara Proceedings of International Structural Engineering and Construction 5 (1 …, 2018 | | 2018 |
Development of contractors’ mitigation practices towards risks out of contractors’ control in construction industry M Algahtany, K Sullivan, D Kashiwagi, J Kashiwagi Proceedings of International Structural Engineering and Construction 5 (1 …, 2018 | | 2018 |
Identification and Assessment of Risks out of Contractors’ Control in the Saudi Construction Industry M Algahtany | | |