The Burr XII distribution in reliability analysis WJ Zimmer, JB Keats, FK Wang Journal of quality technology 30 (4), 386-394, 1998 | 321 | 1998 |
The best vendor selection for conducting the recycled material based on a hybrid MCDM model combining DANP with VIKOR CH Hsu, FK Wang, GH Tzeng Resources, Conservation and Recycling 66, 95-111, 2012 | 295 | 2012 |
An evaluation of freight consolidation policies in global third party logistics JC Tyan, FK Wang, TC Du Omega 31 (1), 55-62, 2003 | 243 | 2003 |
Applying Lean Six Sigma and TRIZ methodology in banking services FK Wang, KS Chen Total Quality Management 21 (3), 301-315, 2010 | 220 | 2010 |
Using principal component analysis in process performance for multivariate data FK Wang, TCT Du Omega 28 (2), 185-194, 2000 | 205 | 2000 |
A new model with bathtub-shaped failure rate using an additive Burr XII distribution FK Wang Reliability Engineering & System Safety 70 (3), 305-312, 2000 | 197 | 2000 |
Capability index using principal components analysis FK Wang, JC Chen Quality engineering 11 (1), 21-27, 1998 | 180 | 1998 |
Comparison of three multivariate process capability indices FK Wang, NF Hubele, FP Lawrence, JD Miskulin, H Shahriari Journal of Quality Technology 32 (3), 263-275, 2000 | 167 | 2000 |
A real-time vehicle-dispatching system for consolidating milk runs T Du, FK Wang, PY Lu Transportation Research Part E: Logistics and Transportation Review 43 (5 …, 2007 | 153 | 2007 |
Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab JT Lin, FK Wang, PY Yen International Journal of Production Research 39 (6), 1221-1238, 2001 | 129 | 2001 |
Applying six-sigma to supplier development FK Wang, T Du, E Li Total Quality Management & Business Excellence 15 (9-10), 1217-1229, 2004 | 119 | 2004 |
A hybrid model based on support vector regression and differential evolution for remaining useful lifetime prediction of lithium-ion batteries FK Wang, T Mamo Journal of Power Sources 401, 49-54, 2018 | 118 | 2018 |
Evaluating the efficiency of implementing total productive maintenance FK Wang Total Quality Management & Business Excellence 17 (5), 655-667, 2006 | 117 | 2006 |
Using adaptive network-based fuzzy inference system to forecast automobile sales FK Wang, KK Chang, CW Tzeng Expert Systems with Applications 38 (8), 10587-10593, 2011 | 116 | 2011 |
Lifetime predictions of LED-based light bars by accelerated degradation test FK Wang, TP Chu Microelectronics Reliability 52 (7), 1332-1336, 2012 | 115 | 2012 |
Learning curve analysis in total productive maintenance FK Wang, W Lee Omega 29 (6), 491-499, 2001 | 110 | 2001 |
Maximum likelihood estimation of the Burr XII parameters with censored and uncensored data FK Wang, JB Keats, WJ Zimmer Microelectronics Reliability 36 (3), 359-362, 1996 | 108 | 1996 |
Applying collaborative transportation management models in global third-party logistics JC Tyan, FK Wang, T Du International Journal of Computer Integrated Manufacturing 16 (4-5), 283-291, 2003 | 98 | 2003 |
Using the design for Six Sigma approach with TRIZ for new product development FK Wang, CT Yeh, TP Chu Computers & Industrial Engineering 98, 522-530, 2016 | 96 | 2016 |
Enhanced production of oxidised mercury over the tropical Pacific Ocean: a key missing oxidation pathway F Wang, A Saiz-Lopez, AS Mahajan, JC Gómez Martín, D Armstrong, ... Atmospheric Chemistry and Physics 14 (3), 1323-1335, 2014 | 91 | 2014 |