A robust approach for the single machine scheduling problem C Briand, HT La, J Erschler Journal of Scheduling 10, 209-221, 2007 | 41 | 2007 |
Nash equilibria for the multi-agent project scheduling problem with controllable processing times A Agnetis, C Briand, JC Billaut, P Šůcha Journal of Scheduling 18, 15-27, 2015 | 40 | 2015 |
A new sufficient condition of optimality for the two-machine flowshop problem C Briand, HT La, J Erschler European Journal of Operational Research 169 (3), 712-722, 2006 | 25 | 2006 |
Fast HOG based person detection devoted to a mobile robot with a spherical camera AA Mekonnen, C Briand, F Lerasle, A Herbulot 2013 IEEE/RSJ International Conference on Intelligent Robots and Systems …, 2013 | 21 | 2013 |
The truck scheduling problem at crossdocking terminals-exclusive versus mixed mode L Berghman, C Briand, R Leus, P Lopez 4th international conference on operations research and enterprise systems …, 2015 | 19 | 2015 |
The truck scheduling problem at cross-docking terminals L Berghman, C Briand, R Leus, P Lopez International Conference on Project Management and Scheduling (PMS 2012), 4p., 2012 | 18 | 2012 |
Scheduling with time lags and preferences: A heuristic C Briand, E Despontin, F Roubellat 8th workshop on Project Management and Scheduling, Valencia, 3-5, 2002 | 16 | 2002 |
De l'ordonnancement déterministe à l'ordannancement distribué sous incertitudes S Ourari Université Paul Sabatier-Toulouse III, 2011 | 14 | 2011 |
An efficient ILP formulation for the single machine scheduling problem C Briand, S Ourari, B Bouzouia RAIRO-Operations Research-Recherche Opérationnelle 44 (1), 61-71, 2010 | 14 | 2010 |
Energy-efficient planning for supplying assembly lines with vehicles C Briand, Y He, SU Ngueveu EURO Journal on Transportation and Logistics 7, 387-414, 2018 | 13 | 2018 |
Finding an optimal Nash equilibrium to the multi-agent project scheduling problem C Briand, SU Ngueveu, P Šůcha Journal of Scheduling 20, 475-491, 2017 | 13 | 2017 |
Minimizing the number of tardy jobs for the single machine scheduling problem: MIP-based lower and upper bounds C Briand, S Ourari RAIRO-Operations Research 47 (1), 33-46, 2013 | 13 | 2013 |
A matheuristic with fixed-sequence reoptimization for a real-life inventory routing problem Y He, C Artigues, C Briand, N Jozefowiez, SU Ngueveu Transportation Science 54 (2), 355-374, 2020 | 12 | 2020 |
Complexity of flow time minimization in a crossdock truck scheduling problem with asymmetric handover relations Q Fabry, A Agnetis, L Berghman, C Briand Operations Research Letters 50 (1), 50-56, 2022 | 11 | 2022 |
People detection with heterogeneous features and explicit optimization on computation time AA Mekonnen, F Lerasle, A Herbulot, C Briand 2014 22nd International Conference on Pattern Recognition, 4322-4327, 2014 | 11 | 2014 |
The resource-constrained activity insertion problem with minimum and maximum time lags C Artigues, C Briand Journal of Scheduling 12 (5), 447-460, 2009 | 11 | 2009 |
Approches par contraintes pour l'ordonnancement robuste C Briand, MJ Huguet, HT La, P Lopez Flexibilité et Robustesse en Ordonnancement sous la direction de JC. Billaut …, 2004 | 11 | 2004 |
Pilotage d'atelier basé sur un ordonnancement flexible C Artigues, C Briand, MC Portmann, F Roubellat Méthodes du pilotage des systèmes de production, 61-97, 2002 | 11 | 2002 |
The multiagent project scheduling problem: complexity of finding a minimum-makespan Nash equilibrium C Briand, A Agnetis, J Billaut In Proceedings of the 13th International Conference on Project Management …, 2012 | 10 | 2012 |
Aide à la décision pour une coopération interentreprise E Monsarrat, C BRIAND, P ESQUIROL Journal européen des systèmes automatisés 39 (7), 799-818, 2005 | 10 | 2005 |