受强制性开放获取政策约束的文章 - adriano luchetta了解详情
无法在其他位置公开访问的文章:7 篇
SPIDER, the negative ion source prototype for ITER: overview of operations and cesium injection
G Serianni, E Sartori, R Agnello, M Agostini, M Barbisan, M Bigi, M Boldrin, ...
IEEE Transactions on Plasma Science 51 (3), 927-935, 2023
强制性开放获取政策: European Commission
Strategy for vacuum insulation tests of MITICA 1 MV electrostatic accelerator
G Chitarin, A Kojima, M Boldrin, A Luchetta, D Marcuzzi, P Zaccaria, ...
IEEE Transactions on Plasma Science 50 (9), 2755-2762, 2022
强制性开放获取政策: European Commission
Diagnostics, data acquisition and control of the divertor test tokamak experiment
R Albanese, R Ambrosino, M Ariola, G De Tommasi, A Pironti, M Cavinato, ...
Fusion Engineering and Design 122, 365-374, 2017
强制性开放获取政策: European Commission
As built design, commissioning and integration of the SPIDER and NBTF central safety systems
A Luchetta, S Dal Bello, M Battistella, L Grando, M Moressa, F Paolucci, ...
Fusion Engineering and Design 190, 113536, 2023
强制性开放获取政策: European Commission
As built design of the control systems of the ITER full-size beam source SPIDER in the neutral beam test facility-A critical review
A Luchetta, C Taliercio, N Cruz, G Martini, G Manduchi, A Rigoni, ...
Fusion Engineering and Design 191, 113624, 2023
强制性开放获取政策: European Commission
Assessment of IEEE 1588-based timing system of the ITER neutral beam test facility
L Trevisan, A Luchetta, G Manduchi, C Taliercio, A Rigoni, P Barbato
IEEE Transactions on Nuclear Science 70 (6), 882-889, 2023
强制性开放获取政策: European Commission
The SPIDER Pulse Plant Configuration Environment
N Cruz, C Taliercio, A Luchetta, G Manduchi, A Rigoni
IEEE Transactions on Nuclear Science 70 (6), 1149-1156, 2023
强制性开放获取政策: Fundação para a Ciência e a Tecnologia, Portugal, European Commission
可在其他位置公开访问的文章:6 篇
First operations with caesium of the negative ion source SPIDER
E Sartori, M Agostini, M Barbisan, M Bigi, M Boldrin, M Brombin, ...
Nuclear fusion 62 (8), 086022, 2022
强制性开放获取政策: European Commission
DTT: a divertor tokamak test facility for the study of the power exhaust issues in view of DEMO
R Albanese, WPDTT2 Team
Nuclear Fusion 57 (1), 016010, 2016
强制性开放获取政策: European Commission
On the road to ITER NBIs: SPIDER improvement after first operation and MITICA construction progress
V Toigo, D Marcuzzi, G Serianni, M Boldrin, G Chitarin, S Dal Bello, ...
Fusion Engineering and Design 168, 112622, 2021
强制性开放获取政策: European Commission
Overview of the RFX-mod contribution to the international Fusion Science Program
ME Puiatti, S Dal Bello, L Marrelli, P Martin, P Agostinetti, M Agostini, ...
Nuclear Fusion 55 (10), 104012, 2015
强制性开放获取政策: European Commission
Lessons learned after three years of SPIDER operation and the first MITICA integrated tests
D Marcuzzi, V Toigo, M Boldrin, G Chitarin, S Dal Bello, L Grando, ...
Fusion Engineering and Design 191, 113590, 2023
强制性开放获取政策: European Commission
Highlights of recent SPIDER results and improvements
E Sartori, R Agnello, M Agostini, M Barbisan, M Bigi, M Boldrin, ...
Journal of Instrumentation 18 (09), C09001, 2023
强制性开放获取政策: European Commission
出版信息和资助信息由计算机程序自动确定