Quoting customer lead times I Duenyas, WJ Hopp Management Science 41 (1), 43-57, 1995 | 269 | 1995 |
Optimal admission control and sequencing in a make-to-stock/make-to-order production system S Carr, I Duenyas Operations research 48 (5), 709-720, 2000 | 257 | 2000 |
Optimal policies for inventory systems with priority demand classes KC Frank, RQ Zhang, I Duenyas Operations Research 51 (6), 993-1002, 2003 | 202 | 2003 |
Single facility due date setting with multiple customer classes I Duenyas Management Science 41 (4), 608-619, 1995 | 179 | 1995 |
Integrated maintenance and production control of a deteriorating production system SMR Iravani, I Duenyas Iie Transactions 34 (5), 423-435, 2002 | 178 | 2002 |
Existence of coordinating transshipment prices in a two-location inventory model X Hu, I Duenyas, R Kapuscinski Management Science 53 (8), 1289-1302, 2007 | 157 | 2007 |
Optimal joint inventory and transshipment control under uncertain capacity X Hu, I Duenyas, R Kapuscinski Operations Research 56 (4), 881-897, 2008 | 112 | 2008 |
Total-cost procurement auctions: Impact of suppliers' cost adjustments on auction format choice D Kostamis, DR Beil, I Duenyas Management Science 55 (12), 1985-1999, 2009 | 106 | 2009 |
Setting single-period optimal capacity levels and prices for substitutable products JR Birge, J Drogosz, I Duenyas International Journal of Flexible Manufacturing Systems 10, 407-430, 1998 | 98 | 1998 |
Timing successive product introductions with demand diffusion and stochastic technology improvement RM Krankel, I Duenyas, R Kapuscinski Manufacturing & Service Operations Management 8 (2), 119-135, 2006 | 97 | 2006 |
Characterizing the output process of a CONWIP line with deterministic processing and random outages I Duenyas, WJ Hopp, ML Spearman Management Science 39 (8), 975-988, 1993 | 87 | 1993 |
Heuristic scheduling of parallel heterogeneous queues with set-ups I Duenyas, MP Van Oyen Management Science 42 (6), 814-829, 1996 | 85 | 1996 |
Real-time dynamic pricing with minimal and flexible price adjustment Q Chen, S Jasin, I Duenyas Management Science 62 (8), 2437-2455, 2016 | 83 | 2016 |
Nonparametric data-driven algorithms for multiproduct inventory systems with censored demand C Shi, W Chen, I Duenyas Operations Research 64 (2), 362-370, 2016 | 81 | 2016 |
Optimal control of a two-stage tandem queuing system with flexible servers HS Ahn, I Duenyas, ME Lewis Probability in the Engineering and Informational Sciences 16 (4), 453-469, 2002 | 80 | 2002 |
Optimal stochastic scheduling of a two-stage tandem queue with parallel servers HS Ahn, I Duenyas, RQ Zhang Advances in Applied Probability 31 (4), 1095-1117, 1999 | 79 | 1999 |
Optimal pricing, production, and inventory for new product diffusion under supply constraints W Shen, I Duenyas, R Kapuscinski Manufacturing & Service Operations Management 16 (1), 28-45, 2014 | 75 | 2014 |
Estimating the throughput of an exponential CONWIP assembly system I Duenyas, WJ Hopp Queueing systems 14, 135-157, 1993 | 72 | 1993 |
Planning and scheduling in Japanese semiconductor manufacturing I Duenyas, JW Fowler, LW Schruben Journal of Manufacturing Systems 13 (5), 323-332, 1994 | 69 | 1994 |
A simple release policy for networks of queues with controllable inputs I Duenyas Operations Research 42 (6), 1162-1171, 1994 | 68 | 1994 |