Measuring the impact of rework on construction cost performance BG Hwang, SR Thomas, CT Haas, CH Caldas Journal of construction engineering and management 135 (3), 187-198, 2009 | 488 | 2009 |
Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects J Song, CT Haas, C Caldas, E Ergen, B Akinci Automation in construction 15 (2), 166-177, 2006 | 361 | 2006 |
Tracking the location of materials on construction job sites J Song, CT Haas, CH Caldas Journal of construction engineering and management 132 (9), 911-918, 2006 | 310 | 2006 |
Automating hierarchical document classification for construction management information systems CH Caldas, L Soibelman Automation in Construction 12 (4), 395-406, 2003 | 264 | 2003 |
Computer vision-based video interpretation model for automated productivity analysis of construction operations J Gong, CH Caldas Journal of Computing in Civil Engineering 24 (3), 252-263, 2010 | 249 | 2010 |
Automated object identification using optical video cameras on construction sites S Chi, CH Caldas Computer‐Aided Civil and Infrastructure Engineering 26 (5), 368-380, 2011 | 248 | 2011 |
Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources J Teizer, CH Caldas, CT Haas Journal of Construction Engineering and Management 133 (11), 880-888, 2007 | 234 | 2007 |
Benchmarking initiatives in the construction industry: Lessons learned and improvement opportunities DB Costa, CT Formoso, M Kagioglou, LF Alarcón, CH Caldas Journal of Management in Engineering 22 (4), 158-167, 2006 | 229 | 2006 |
Automated classification of construction project documents CH Caldas, L Soibelman, J Han Journal of Computing in Civil Engineering 16 (4), 234-243, 2002 | 222 | 2002 |
Methodology for automating the identification and localization of construction components on industrial projects DG Torrent, CH Caldas Journal of computing in civil engineering 23 (1), 3-13, 2009 | 189 | 2009 |
An object recognition, tracking, and contextual reasoning-based video interpretation method for rapid productivity analysis of construction operations J Gong, CH Caldas Automation in Construction 20 (8), 1211-1226, 2011 | 188 | 2011 |
Assessing the impact of materials tracking technologies on construction craft productivity D Grau, CH Caldas, CT Haas, PM Goodrum, J Gong Automation in Construction 18 (7), 903-911, 2009 | 183 | 2009 |
Learning and classifying actions of construction workers and equipment using Bag-of-Video-Feature-Words and Bayesian network models J Gong, CH Caldas, C Gordon Advanced Engineering Informatics 25 (4), 771-782, 2011 | 174 | 2011 |
A proximity-based method for locating RFID tagged objects J Song, CT Haas, CH Caldas Advanced Engineering Informatics 21 (4), 367-376, 2007 | 170 | 2007 |
Activity analysis for direct-work rate improvement in construction MC Gouett, CT Haas, PM Goodrum, CH Caldas Journal of Construction Engineering and Management 137 (12), 1117-1124, 2011 | 158 | 2011 |
Management and analysis of unstructured construction data types L Soibelman, J Wu, C Caldas, I Brilakis, KY Lin Advanced Engineering Informatics 22 (1), 15-27, 2008 | 151 | 2008 |
Image-based safety assessment: Automated spatial safety risk identification of earthmoving and surface mining activities S Chi, CH Caldas Journal of Construction Engineering and Management 138 (3), 341-351, 2012 | 150 | 2012 |
Using global positioning system to improve materials-locating processes on industrial projects CH Caldas, DG Torrent, CT Haas Journal of Construction Engineering and Management 132 (7), 741-749, 2006 | 143 | 2006 |
Materials management practices in the construction industry CH Caldas, CL Menches, PM Reyes, L Navarro, DM Vargas Practice Periodical on Structural Design and Construction 20 (3), 04014039, 2015 | 129 | 2015 |
Methodology for the integration of project documents in model-based information systems CH Caldas, L Soibelman, L Gasser Journal of Computing in Civil Engineering 19 (1), 25-33, 2005 | 122 | 2005 |