Optimization model for the selection of materials using a LEED-based green building rating system in Colombia D Castro-Lacouture, JA Sefair, L Florez, AL Medaglia Building and Environment 44 (6), 1162-1170, 2009 | 446 | 2009 |
Optimization model for sustainable materials selection using objective and subjective factors L Florez, D Castro-Lacouture Materials & Design (1980-2015) 46, 310-321, 2013 | 92 | 2013 |
Exploring the critical nexus between authoritarian leadership, project team member's silence and multi-dimensional success in a state-owned mega construction project U Zaman, L Florez-Perez, MG Khwaja, S Abbasi, MG Qureshi International Journal of Project Management 39 (8), 873-886, 2021 | 52 | 2021 |
Measuring sustainability perceptions of construction materials L Florez, D Castro, J Irizarry Construction Innovation 13 (2), 217-234, 2013 | 52 | 2013 |
Shadow of your former self: Exploring project leaders’ post-failure behaviors (resilience, self-esteem and self-efficacy) in high-tech startup projects U Zaman, L Florez-Perez, P Farías, S Abbasi, MG Khwaja, TI Wijaksana Sustainability 13 (22), 12868, 2021 | 50 | 2021 |
At the end of the world, turn left: examining toxic leadership, team silence and success in mega construction projects U Zaman, L Florez-Perez, M Anjam, M Ghani Khwaja, N Ul-Huda Engineering, Construction and Architectural Management 30 (6), 2436-2462, 2023 | 46 | 2023 |
Sustainable workforce scheduling in construction program management L Florez, D Castro-Lacouture, AL Medaglia Journal of the Operational Research Society 64 (8), 1169-1181, 2013 | 45 | 2013 |
Overview of construction simulation approaches to model construction processes O Bokor, L Florez, A Osborne, BJ Gledson Organization, technology & management in construction: an international …, 2019 | 42 | 2019 |
Defining a mathematical function for labor productivity in masonry construction: A case study L Florez, JC Cortissoz Procedia Engineering 164, 42-48, 2016 | 34 | 2016 |
Crew allocation system for the masonry industry L Florez Computer-Aided Civil and Infrastructure Engineering, 2017 | 30 | 2017 |
Grand challenges in construction management Z Chen Frontiers in Built Environment 5, 31, 2019 | 26 | 2019 |
A stitch in time saves nine: Nexus between critical delay factors, leadership self-efficacy, and transnational mega construction project success U Zaman, L Florez-Perez, S Abbasi, S Nawaz, P Farías, M Pradana Sustainability 14 (4), 2091, 2022 | 25 | 2022 |
Sustainability and green building rating systems: A critical analysis to advance sustainable performance L Florez Encyclopedia of Renewable and Sustainable Materials, Elsevier, 211-220, 2020 | 23 | 2020 |
Using workers compatibility to predict labor productivity through cluster analysis L Florez, JC Cortissoz Procedia Engineering 196, 359-365, 2017 | 19 | 2017 |
Integrating facility management information into BIM using COBie: Current status and future directions L Florez, K Afsari ISARC, 2018 | 17* | 2018 |
Impact of sustainability perceptions on optimal material selection in construction projects L Florez, D Castro, J Irizarry Proceedings of the Second International Conference on Sustainable …, 2010 | 17 | 2010 |
Using machine learning to analyze and predict construction task productivity L Florez‐Perez, Z Song, JC Cortissoz Computer‐Aided Civil and Infrastructure Engineering 37 (12), 1602-1616, 2022 | 16 | 2022 |
Maximizing labor stability as a sustainability performance indicator in project scheduling L Florez, D Castro, AL Medaglia ASCE 2012 Construction Research Congress, 465-474, 2012 | 15 | 2012 |
Barriers to implementing solar energy systems in buildings: The resident’s perspective in Malaysia L Florez, NN Ghazali Proc. 28th Annual Conference of the International Group for Lean …, 2020 | 14 | 2020 |
Predicting implications of design changes in BIM-based construction projects through machine learning BS Abdulfattah, HA Abdelsalam, M Abdelsalam, M Bolpagni, ... Automation in Construction 155, 105057, 2023 | 12 | 2023 |