Backward-forward hybrid genetic algorithm for resource-constrained multiproject scheduling problem R Sonmez, F Uysal Journal of Computing in Civil Engineering 29 (5), 04014072, 2015 | 50 | 2015 |
Resource constrained project scheduling with stochastic resources F Uysal, SK Işleyen, C Cetinkaya Journal of applied research on industrial engineering 5 (1), 39-49, 2018 | 17 | 2018 |
Critical sequence crashing heuristic for resource-constrained discrete time–cost trade-off problem R Sonmez, MA Iranagh, F Uysal Journal of construction engineering and management 142 (3), 04015090, 2016 | 16 | 2016 |
A transformative solution for construction safety: Blockchain-based system for accident information management S Ahmadisheykhsarmast, S Aminbakhsh, R Sonmez, F Uysal Journal of Industrial Information Integration 35, 100491, 2023 | 10 | 2023 |
A graphical processing unit‐based parallel hybrid genetic algorithm for resource‐constrained multi‐project scheduling problem F Uysal, R Sonmez, SK Isleyen Concurrency and Computation: Practice and Experience 33 (16), e6266, 2021 | 8 | 2021 |
Comparison of Traffic Accident Injury Severity Prediction Models with Explainable Machine Learning E Cicek, M Akin, F Uysal, RM Topcu Aytas Transportation Letters, 1-12, 2023 | 7 | 2023 |
Geographic information system–based visualization system for planning and monitoring of repetitive construction projects R Sonmez, F Uysal Canadian Journal of civil engineering 35 (11), 1342-1346, 2008 | 7 | 2008 |
Bootstrap Aggregated Case-Based Reasoning Method for Conceptual Cost Estimation F Uysal, R Sonmez Buildings 13 (3), 651, 2023 | 5 | 2023 |
A Smart Contract Framework as an Alternative Method for Letter of Credit Use in Construction Procurement F Uysal, S Ahmadisheykhsarmast, R Sonmez Proceedings of The Twelfth International Conference on Construction in the …, 2022 | 3 | 2022 |
A GPS/GIS based line of balance method for planning and control of construction projects F Uysal METU Institute for Graduate Studies, 2007 | 3 | 2007 |
Decision Tree Analysis in Project Risk Management: A Systematic Review A ZAKU, F UYSAL Proceedings of The Twelfth International Conference on Construction in the …, 2022 | 2* | 2022 |
Hybrid Meta-heuristic Algorithms for the Resource Constrained Multi-project Scheduling Problem F Uysal METU Institute for Graduate Studies, 2014 | 2 | 2014 |
Discussion of “Artificial Intelligence and Parametric Construction Cost Estimate Modeling: State-of-the-Art Review” by Haytham H. Elmousalami R Sonmez, F Uysal Journal of Construction Engineering and Management 147 (6), 07021001, 2021 | 1 | 2021 |
Investigating the Impact of Blockchain on Project Risk Management Success: A Structural Equation Model S Demirkesen, A Tezel, F Uysal, Z Ozturk IEEE Transactions on Engineering Management, 2024 | | 2024 |
A Memetic Algorithm for the Solution of the Resource Leveling Problem M Iranagh, R Sonmez, T Atan, F Uysal, ÖH Bettemir Buildings 13 (11), 2738, 2023 | | 2023 |
Resource Constrained Project Scheduling Problem: An Analytical Approach F Uysal, SK İşleyen, C Çetinkaya, Ç Nazmiye 5th International Conference Industrial Engineering and Enviromental …, 2015 | | 2015 |
Planning of Linear Construction Projects Using Geographic Information Systems R Sonmez, F Uysal Proceedings of the Fifth International Conference on Construction in the …, 2009 | | 2009 |
Effect of Similarity Functions in Case Based Reasoning Models for Conceptual Cost F UYSAL | | |