Balancing and scheduling assembly lines with human-robot collaboration tasks A Nourmohammadi, M Fathi, AHC Ng Computers & Operations Research, 105674, 2022 | 76 | 2022 |
Assembly line balancing by a new multi-objective differential evolution algorithm based on TOPSIS A Nourmohammadi, M Zandieh International Journal of Production Research 49 (10), 2833-2855, 2011 | 70 | 2011 |
An imperialist competitive algorithm for multi-objective U-type assembly line design A Nourmohammadi, M Zandieh, R Tavakkoli-Moghaddam Journal of Computational Science 4 (5), 393-400, 2013 | 59 | 2013 |
An improved genetic algorithm with variable neighborhood search to solve the assembly line balancing problem M Fathi, A Nourmohammadi, AHC Ng, A Syberfeldt, H Eskandari Engineering Computations 37 (2), 501-521, 2020 | 32 | 2020 |
Design of stochastic assembly lines considering line balancing and part feeding with supermarkets A Nourmohammadi, H Eskandari, M Fathi Engineering Optimization 51 (1), 63-83, 2019 | 31 | 2019 |
An optimization model for balancing assembly lines with stochastic task times and zoning constraints M Fathi, A Nourmohammadi, AHC Ng, A Syberfeldt IEEE Access 7, 32537-32550, 2019 | 25 | 2019 |
Assembly line design considering line balancing and part feeding A Nourmohammadi, H Eskandari Assembly Automation 37 (1), 135-143, 2017 | 25 | 2017 |
Integrated locating in-house logistics areas and transport vehicles selection problem in assembly lines A Nourmohammadi, H Eskandari, M Fathi, AHC Ng International Journal of Production Research 59 (2), 598-616, 2021 | 24 | 2021 |
A water-flow like algorithm for solving U-shaped assembly line balancing problems A Nourmohammadi, M Fathi, M Zandieh, M Ghobakhloo IEEE Access 7, 129824-129833, 2019 | 20 | 2019 |
Production sustainability via supermarket location optimization in assembly lines M Fathi, A Nourmohammadi, M Ghobakhloo, M Yousefi Sustainability 12 (11), 4728, 2020 | 19 | 2020 |
An integrated model for cost-oriented assembly line balancing and parts feeding with supermarkets A Nourmohammadi, H Eskandari, M Fathi, MR Bourani Procedia Cirp 72, 381-385, 2018 | 18 | 2018 |
A genetic algorithm for heterogenous human-robot collaboration assembly line balancing problems A Nourmohammadi, M Fathi, AHC Ng, E Mahmoodi Procedia CiRP 107, 1444-1448, 2022 | 13 | 2022 |
Multi-objective optimization of mixed-model assembly lines incorporating musculoskeletal risks assessment using digital human modeling A Nourmohammadi, AHC Ng, M Fathi, J Vollebregt, L Hanson CIRP Journal of Manufacturing Science and Technology 47, 71-85, 2023 | 12 | 2023 |
Choosing efficient meta-heuristics to solve the assembly line balancing problem: A landscape analysis approach A Nourmohammadi, M Fathi, AHC Ng Procedia CIRP 81, 1248-1253, 2019 | 10 | 2019 |
Decreasing the crane working time in retrieving the containers from a bay E Azari, H Eskandari, A Nourmohammadi Scientia Iranica 24 (1), 309-318, 2017 | 10 | 2017 |
A mathematical model for supermarket location problem with stochastic station demands A Nourmohammadi, H Eskandari, M Fathi, M Aghdasi Procedia CIRP 72, 444-449, 2018 | 9 | 2018 |
Multi-objective optimisation of tool indexing problem: a mathematical model and a modified genetic algorithm K Amouzgar, A Nourmohammadi, AHC Ng International Journal of Production Research 59 (12), 3572-3590, 2021 | 8 | 2021 |
An enhanced simulation-based multi-objective optimization approach with knowledge discovery for reconfigurable manufacturing systems CA Barrera-Diaz, A Nourmohammadi, H Smedberg, T Aslam, AHC Ng Mathematics 11 (6), 1527, 2023 | 7 | 2023 |
Knowledge-Driven Multi-Objective Optimization for Reconfigurable Manufacturing Systems H Smedberg, CA Barrera-Diaz, A Nourmohammadi, S Bandaru, AHC Ng Mathematical and Computational Applications 27 (6), 106, 2022 | 4 | 2022 |
Balancing and scheduling human-robot collaborated assembly lines with layout and objective consideration A Nourmohammadi, M Fathi, AHC Ng Computers & industrial engineering 187, 109775, 2024 | 3 | 2024 |