关注
Prof. Tariq Aldowaisan
Prof. Tariq Aldowaisan
Professor of Industrial Engineering,
在 glc-im.com 的电子邮件经过验证
标题
引用次数
引用次数
年份
A review of scheduling research involving setup considerations
A Allahverdi, JND Gupta, T Aldowaisan
Omega 27 (2), 219-239, 1999
13261999
New heuristics for no-wait flowshops to minimize makespan
T Aldowaisan, A Allahverdi
Computers & Operations Research 30 (8), 1219-1231, 2003
2482003
New heuristics for m-machine no-wait flowshop to minimize total completion time
T Aldowaisan, A Allahverdi
Omega 32 (5), 345-352, 2004
1722004
Total flowtime in no-wait flowshops with separated setup times
T Aldowaisan, A Allahverdi
Computers & Operations Research 25 (9), 757-765, 1998
1231998
Business process reengineering: an approach for process mapping
TA Aldowaisan, LK Gaafar
Omega 27 (5), 515-524, 1999
1221999
New heuristics to minimize total completion time in m-machine flowshops
A Allahverdi, T Aldowaisan
International Journal of Production Economics 77 (1), 71-83, 2002
1142002
An ISO 9001: 2000-based framework for realizing quality in small businesses
TA Aldowaisan, AS Youssef
Omega 34 (3), 231-235, 2006
982006
A new heuristic and dominance relations for no-wait flowshops with setups
T Aldowaisan
Computers & Operations Research 28 (6), 563-584, 2001
942001
No-wait flowshops with bicriteria of makespan and maximum lateness
A Allahverdi, T Aldowaisan
European Journal of Operational Research 152 (1), 132-147, 2004
762004
No‐wait and separate setup three‐machine flowshop with total completion time criterion
A Allahverdi, T Aldowaisan
International Transactions in Operational Research 7 (3), 245-264, 2000
702000
Six Sigma performance for non-normal processes
T Aldowaisan, M Nourelfath, J Hassan
European Journal of Operational Research 247 (3), 968-977, 2015
682015
Two‐machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times
A Allahverdi, T Aldowaisan, YN Sotskov
International Journal of Mathematics and Mathematical Sciences 2003 (39 …, 2003
612003
Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times
A Allahverdi, T Aldowaisan
Journal of the Operational Research Society 52 (4), 449-462, 2001
532001
No-wait flowshops with bicriteria of makespan and total completion time
A Allahverdi, T Aldowaisan
Journal of the Operational Research Society 53 (9), 1004-1015, 2002
502002
Minimizing total tardiness in no-wait flowshops
T Aldowaisan, A Allahverdi
Foundations of Computing and Decision Sciences 37 (3), 149-162, 2012
392012
Job lateness in flowshops with setup and removal times separated
A Allahverdi, T Aldowaisan
Journal of the Operational Research Society 49 (9), 1001-1006, 1998
241998
Socio-economic impacts of strategic oil and gas megaprojects: A case study in Kuwait
M Nourelfath, HMS Lababidi, T Aldowaisan
International Journal of Production Economics 246, 108416, 2022
232022
A framework for developing technical process reengineering designs
TA Aldowaisan, LK Gaafar
Computers & industrial engineering 32 (3), 657-670, 1997
201997
No-wait flowshop scheduling problem to minimize the number of tardy jobs
TA Aldowaisan, A Allahverdi
The International Journal of Advanced Manufacturing Technology 61, 311-323, 2012
182012
No-wait flowshops to minimize total tardiness with setup times
T Aldowaisan, A Allahverdi
Intelligent Control and Automation 6 (01), 38, 2015
162015
系统目前无法执行此操作,请稍后再试。
文章 1–20