A review of scheduling research involving setup considerations A Allahverdi, JND Gupta, T Aldowaisan Omega 27 (2), 219-239, 1999 | 1326 | 1999 |
New heuristics for no-wait flowshops to minimize makespan T Aldowaisan, A Allahverdi Computers & Operations Research 30 (8), 1219-1231, 2003 | 248 | 2003 |
New heuristics for m-machine no-wait flowshop to minimize total completion time T Aldowaisan, A Allahverdi Omega 32 (5), 345-352, 2004 | 172 | 2004 |
Total flowtime in no-wait flowshops with separated setup times T Aldowaisan, A Allahverdi Computers & Operations Research 25 (9), 757-765, 1998 | 123 | 1998 |
Business process reengineering: an approach for process mapping TA Aldowaisan, LK Gaafar Omega 27 (5), 515-524, 1999 | 122 | 1999 |
New heuristics to minimize total completion time in m-machine flowshops A Allahverdi, T Aldowaisan International Journal of Production Economics 77 (1), 71-83, 2002 | 114 | 2002 |
An ISO 9001: 2000-based framework for realizing quality in small businesses TA Aldowaisan, AS Youssef Omega 34 (3), 231-235, 2006 | 98 | 2006 |
A new heuristic and dominance relations for no-wait flowshops with setups T Aldowaisan Computers & Operations Research 28 (6), 563-584, 2001 | 94 | 2001 |
No-wait flowshops with bicriteria of makespan and maximum lateness A Allahverdi, T Aldowaisan European Journal of Operational Research 152 (1), 132-147, 2004 | 76 | 2004 |
No‐wait and separate setup three‐machine flowshop with total completion time criterion A Allahverdi, T Aldowaisan International Transactions in Operational Research 7 (3), 245-264, 2000 | 70 | 2000 |
Six Sigma performance for non-normal processes T Aldowaisan, M Nourelfath, J Hassan European Journal of Operational Research 247 (3), 968-977, 2015 | 68 | 2015 |
Two‐machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times A Allahverdi, T Aldowaisan, YN Sotskov International Journal of Mathematics and Mathematical Sciences 2003 (39 …, 2003 | 61 | 2003 |
Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times A Allahverdi, T Aldowaisan Journal of the Operational Research Society 52 (4), 449-462, 2001 | 53 | 2001 |
No-wait flowshops with bicriteria of makespan and total completion time A Allahverdi, T Aldowaisan Journal of the Operational Research Society 53 (9), 1004-1015, 2002 | 50 | 2002 |
Minimizing total tardiness in no-wait flowshops T Aldowaisan, A Allahverdi Foundations of Computing and Decision Sciences 37 (3), 149-162, 2012 | 39 | 2012 |
Job lateness in flowshops with setup and removal times separated A Allahverdi, T Aldowaisan Journal of the Operational Research Society 49 (9), 1001-1006, 1998 | 24 | 1998 |
Socio-economic impacts of strategic oil and gas megaprojects: A case study in Kuwait M Nourelfath, HMS Lababidi, T Aldowaisan International Journal of Production Economics 246, 108416, 2022 | 23 | 2022 |
A framework for developing technical process reengineering designs TA Aldowaisan, LK Gaafar Computers & industrial engineering 32 (3), 657-670, 1997 | 20 | 1997 |
No-wait flowshop scheduling problem to minimize the number of tardy jobs TA Aldowaisan, A Allahverdi The International Journal of Advanced Manufacturing Technology 61, 311-323, 2012 | 18 | 2012 |
No-wait flowshops to minimize total tardiness with setup times T Aldowaisan, A Allahverdi Intelligent Control and Automation 6 (01), 38, 2015 | 16 | 2015 |