Two-sided assembly line balancing considering the relationships between tasks D Khorasanian, SR Hejazi, G Moslehi Computers & Industrial Engineering 66 (4), 1096-1105, 2013 | 60 | 2013 |
Optimizing blocking flow shop scheduling problem with total completion time criterion G Moslehi, D Khorasanian Computers & Operations Research 40 (7), 1874-1883, 2013 | 54 | 2013 |
A hybrid variable neighborhood search algorithm for solving the limited-buffer permutation flow shop scheduling problem with the makespan criterion G Moslehi, D Khorasanian Computers & Operations Research 52, 260-268, 2014 | 51 | 2014 |
Two-machine flow shop scheduling problem with blocking, multi-task flexibility of the first machine, and preemption D Khorasanian, G Moslehi Computers & Operations Research 79, 94-108, 2017 | 25 | 2017 |
An iterated greedy algorithm for solving the blocking flow shop scheduling problem with total flow time criteria D Khorasanian, G Moslehi International Journal of Industrial Engineering and Production Research 23 …, 2012 | 23 | 2012 |
Analyses of the phase I postanesthesia care unit baseline capacity and effect of disruptions to its beds or nurse availability on operating room workflow D Khorasanian, F Dexter, G Moslehi International Journal of Planning and Scheduling 2 (4), 350-372, 2018 | 6 | 2018 |
Minimising the number of cancellations at the time of a severe lack of postanesthesia care unit beds or nurses D Khorasanian, F Dexter, E Demeulemeester, G Moslehi International Journal of Production Research 60 (11), 3383-3396, 2022 | 4 | 2022 |
Dynamic home care routing and scheduling with uncertain number of visits per referral D Khorasanian, J Patrick, A Sauré Transportation Science, 2024 | 1 | 2024 |