Consignment and vendor managed inventory in single-vendor multiple buyers supply chains M Ben-Daya, E Hassini, M Hariga, MM AlDurgam International Journal of Production Research 51 (5), 1347-1365, 2013 | 121 | 2013 |
A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate M AlDurgam, K Adegbola, CH Glock International Journal of Production Economics 191, 335-350, 2017 | 99 | 2017 |
Optimal joint maintenance and operation policies to maximise overall systems effectiveness MM AlDurgam, SO Duffuaa International Journal of Production Research 51 (5), 1319-1330, 2013 | 51 | 2013 |
A generalised framework for simulation-based decision support for manufacturing MM AlDurgham, MA Barghash Production Planning and Control 19 (5), 518-534, 2008 | 49 | 2008 |
A max-min ant system for the finance-based scheduling problem ST Al-Shihabi, MM AlDurgam Computers & Industrial Engineering 110, 264-276, 2017 | 30 | 2017 |
The contractor time–cost–credit trade‐off problem: integer programming model, heuristic solution, and business insights S Al‐Shihabi, MM AlDurgam International Transactions in Operational Research 27 (6), 2841-2877, 2020 | 10 | 2020 |
Economic production quantity model with variable machining rates and product quality MM AlDurgam, SZ Selim, ST Al-Shihabi, L Al-Durgham International Journal of Engineering Business Management 11, 1847979019872619, 2019 | 7 | 2019 |
Optimal Maintenance Scheduling of N-Vehicles with Time-varying reward functions and constrained maintenance decisions MM Aldurgam, M Elshafei Operations Research Proceedings 2010: Selected Papers of the Annual …, 2011 | 7 | 2011 |
Multi-objective optimization for the multi-mode finance-based project scheduling problem S Al-Shihabi, M Aldurgam Frontiers of Engineering Management, 1-15, 2020 | 6 | 2020 |
Productivity Improvement Through Multi-Objective Simulation Optimization—A Case Study MM Aldurgam, MY Alghadeer, MAM Abdel-Aal, SZ Selim IEEE Access 7, 40230-40239, 2019 | 6 | 2019 |
Impact of climate indicators on the COVID-19 pandemic in Saudi Arabia MAM Abdel-Aal, AEE Eltoukhy, MA Nabhan, MM AlDurgam Environmental Science and Pollution Research, 1-14, 2021 | 4 | 2021 |
An integrated inventory and workforce planning Markov decision process model with a variable production rate MM AlDurgam IFAC-PapersOnLine 52 (13), 2792-2797, 2019 | 4 | 2019 |
Optimal maintenance policies for three-states POMDP with quality measurement errors MM AlDurgam, SO Duffuaa 2010 IEEE International Conference on Industrial Engineering and Engineering …, 2010 | 4 | 2010 |
An MDP Model for Integrated Operational Decision Making Under Uncertainty in a Gas and Oil Separation Plant MM Aldurgam, A Alzahrani, A Nasir IEEE Access 9, 126774-126788, 2021 | 2 | 2021 |
An integrated process targeting and continuous review system with sampling inspection FM Tuffaha, MM AlDurgam International Journal of Engineering Business Management 13, 1847979021999271, 2021 | 2 | 2021 |
Dynamic maintenance, production and inspection policies, for a single-stage, multi-state production system MM Aldurgam IEEE Access 8, 105645-105658, 2020 | 2 | 2020 |
Optimal process targeting for multi-inputs, multi-stages and multi-characteristics production systems M AlDurgam, M Elshafei International journal of production research 50 (22), 6329-6338, 2012 | 2 | 2012 |
A Scientometric Analysis of the Capacity Expansion and Planning Research MM AlDurgam, FM Tuffaha, MAM Abdel-Aal, Y Almoghathawi, HH Saleh, ... IEEE Transactions on Engineering Management 71, 6382-6405, 2023 | 1 | 2023 |
An Integrated Two-Stage Inventory and Workforce Planning Model with Variable Production Rates M AlDurgam, AA Hanbali, T Saeed, F Tuffaha Arabian Journal for Science and Engineering 48 (5), 7127-7144, 2023 | | 2023 |
Optimal Project Completion Time, a Multi-Objective Model and Monte Carlo Simulation-Optimization Solution MM AlDurgam 2019 Industrial & Systems Engineering Conference (ISEC), 1-5, 2019 | | 2019 |