Pharmaceutical supply chain and inventory management strategies: Optimization for a pharmaceutical company and a hospital R Uthayakumar, S Priyan Operations Research for Health Care 2 (3), 52-64, 2013 | 386 | 2013 |
Optimal inventory management strategies for pharmaceutical company and hospital supply chain in a fuzzy-stochastic environment S Priyan, R Uthayakumar Operations Research for Health Care 3 (4), 177–190, 2014 | 86 | 2014 |
Continuous review inventory model with controllable lead time, lost sales rate and order processing cost when the received quantity is uncertain S Priyan, R Uthayakumar Journal of Manufacturing Systems 34 (1), 23–33, 2015 | 45 | 2015 |
Optimal inventory system for pharmaceutical products incorporating quality degradation with expiration date: A game theory approach S Priyan, P Mala Operations Research for Health Care 24, 100245, 2020 | 37 | 2020 |
Two-echelon multi-product multi-constraint product returns inventory model with permissible delay in payments and variable lead time S Priyan, R Uthayakumar Journal of Manufacturing Systems 36 (1), 244–262, 2015 | 36 | 2015 |
Trade credit financing in the vendor–buyer inventory system with ordering cost reduction, transportation cost and backorder price discount when the received quantity is uncertain S Priyan, R Uthayakumar Journal of Manufacturing Systems 33 (4), 654–674, 2014 | 32 | 2014 |
Permissible delay in payments in the two-echelon inventory system with controllable setup cost and lead time under service level constraint R Uthayakumar, S Priyan International Journal of Information and Management Sciences 24 (3), 193-211, 2013 | 31 | 2013 |
An integrated production–distribution inventory system involving probabilistic defective and errors in quality inspection under variable setup cost S Priyan, R Uthayakumar International Transactions in Operational Research 24 (6), 1487-1524, 2017 | 25 | 2017 |
A sustainable dual-channel inventory model with trapezoidal fuzzy demand and energy consumption S Priyan, R Udayakumar, P Mala, M Prabha, A Ghosh Cleaner Engineering and Technology 6, 100400, 2022 | 24 | 2022 |
A cleaner EPQ model involving synchronous and asynchronous rework process with green technology investment S Priyan, P Mala, M Palanivel Cleaner Logistics and Supply Chain 4, 100056, 2022 | 22 | 2022 |
An inventory model with finite replenishment, probabilistic deterioration and permissible delay in payments M Palanivel, S Priyan, R Uthayakumar Journal of Management Analytics 2 (3), 254-279, 2015 | 21 | 2015 |
Operations Research in Healthcare: A Review S Priyan Juniper Online Journal of Public Health 1 (3), 1-12, 2017 | 20 | 2017 |
Effect of green investment to reduce carbon emissions in an imperfect production system S Priyan Journal of Climate Finance 2, 100007, 2023 | 18 | 2023 |
Two-echelon production-inventory system with fuzzy production rate and promotional effort dependent demand S Priyan, M Palanivel, R Uthayakumar Journal of Management Analytics 2 (1), 72-92, 2015 | 18 | 2015 |
Optimal inventory modeling of supply chain system involving quality inspection errors and fuzzy defective rate S Priyan, P Manivannan OPSEARCH 54 (1), 21–43, 2017 | 16 | 2017 |
Mathematical Modeling and Computational Algorithm to Solve Multi-Echelon Multi-Constraint Inventory Problem with Errors in Quality Inspection S Priyan, R Uthayakumar Journal of Mathematical Modelling and Algorithms in Operations Research 14 …, 2015 | 15 | 2015 |
Two-warehouse system for non-instantaneous deterioration products with promotional effort and inflation over a finite time horizon M Palanivel, S Priyan, P Mala Journal of Industrial Engineering International 14, 603-612, 2018 | 14 | 2018 |
Mathematical modelling for EOQ inventory system with advance payment and fuzzy parameters S Priyan, M Palanivel, R Uthayakumar International journal of supply and operations management 1 (3), 260-278, 2014 | 13 | 2014 |
An integrated production-distribution inventory system for deteriorating products involving fuzzy deterioration and variable setup cost S Priyan, R Uthayakumar Journal of Industrial and Production Engineering 31 (8), 491-503., 2014 | 13 | 2014 |
Economic design of multi-echelon inventory system with variable lead time and service level constraint in a fuzzy cost environment S Priyan, R Uthayakumar Fuzzy Information and Engineering 8 (4), 465-511, 2016 | 12 | 2016 |