Automatic Pixel‐Level Crack Detection and Measurement Using Fully Convolutional Network X Yang, H Li, Y Yu, X Luo, T Huang, X Yang Computer‐Aided Civil and Infrastructure Engineering, 2018 | 679 | 2018 |
Detecting non-hardhat-use by a deep learning method from far-field surveillance videos Q Fang, H Li, X Luo, L Ding, H Luo, TM Rose, W An Automation in construction 85, 1-9, 2018 | 500 | 2018 |
Integration of BIM and GIS in sustainable built environment: A review and bibliometric analysis H Wang, Y Pan, X Luo Automation in construction 103, 41-52, 2019 | 315 | 2019 |
Recognizing Diverse Construction Activities in Site Images via Relevance Networks of Construction-Related Objects Detected by Convolutional Neural Networks X Luo, H Li, D Cao, F Dai, JO Seo, SH Lee Journal of Computing in Civil Engineering 32 (3), 04018012, 2018 | 176 | 2018 |
A deep learning-based method for detecting non-certified work on construction sites Q Fang, H Li, X Luo, L Ding, TM Rose, W An, Y Yu Advanced Engineering Informatics 35, 56-68, 2018 | 165 | 2018 |
An automatic and non-invasive physical fatigue assessment method for construction workers Y Yu, H Li, X Yang, L Kong, X Luo, AYL Wong Automation in construction 103, 1-12, 2019 | 161 | 2019 |
Toward low-carbon construction processes: the visualisation of predicted emission via virtual prototyping technology JKW Wong, H Li, H Wang, T Huang, E Luo, V Li Automation in Construction 33, 72-78, 2013 | 148 | 2013 |
Towards efficient and objective work sampling: Recognizing workers' activities in site surveillance videos with two-stream convolutional networks X Luo, H Li, D Cao, Y Yu, X Yang, T Huang Automation in Construction 94 (2018), 360-370, 2018 | 142 | 2018 |
Computer vision aided inspection on falling prevention measures for steeplejacks in an aerial environment Q Fang, H Li, X Luo, L Ding, H Luo, C Li Automation in Construction 93, 148-164, 2018 | 141 | 2018 |
Capturing and Understanding Workers’ Activities in Far‐Field Surveillance Videos with Deep Action Recognition and Bayesian Nonparametric Learning X Luo, H Li, X Yang, Y Yu, D Cao Computer-Aided Civil and Infrastructure Engineering 34 (4), 333-351, 2019 | 108 | 2019 |
Vision-based detection and visualization of dynamic workspaces X Luo, H Li, H Wang, Z Wu, F Dai, D Cao Automation in Construction 104, 1-13, 2019 | 82 | 2019 |
Pre-service fatigue screening for construction workers through wearable EEG-based signal spectral analysis H Li, D Wang, J Chen, X Luo, J Li, X Xing Automation in Construction 106, 102851, 2019 | 78 | 2019 |
Joint-Level Vision-Based Ergonomic Assessment Tool for Construction Workers, Journal of Construction Engineering and Management Y Yu, X Yang, H Li, X Luo, H Guo, Q Fang Journal of Construction Engineering and Management 145 (5), 04019025, 2019 | 78 | 2019 |
Dynamics of project-based collaborative networks for BIM implementation: Analysis based on stochastic actor-oriented models D Cao, H Li, G Wang, X Luo, X Yang, D Tan Journal of Management in Engineering 33 (3), 04016055, 2017 | 78 | 2017 |
Developing a green building evaluation standard for interior decoration: A case study of China Z Wu, H Li, Y Feng, X Luo, Q Chen Building and Environment 152, 50-58, 2019 | 76 | 2019 |
Investigation of the causality patterns of non-helmet use behavior of construction workers H Li, X Li, X Luo, J Siebert Automation in Construction 80, 95-103, 2017 | 76 | 2017 |
Relationship network structure and organizational competitiveness: Evidence from BIM implementation practices in the construction industry D Cao, H Li, G Wang, X Luo, D Tan Journal of management in engineering 34 (3), 04018005, 2018 | 75 | 2018 |
Chirp-spread-spectrum-based real time location system for construction safety management: A case study H Li, G Chan, T Huang, M Skitmore, TYE Tao, E Luo, J Chung, XS Chan, ... Automation in construction 55, 58-65, 2015 | 71 | 2015 |
Physical exertion modeling for construction tasks using combined cardiorespiratory and thermoregulatory measures W Umer, H Li, Y Yantao, MF Antwi-Afari, S Anwer, X Luo Automation in Construction 112, 103079, 2020 | 66 | 2020 |
Optimal single-machine batch scheduling for the manufacture, transportation and JIT assembly of precast construction with changeover costs within due dates L Kong, H Li, H Luo, L Ding, X Luo, M Skitmore Automation in Construction 81, 34-43, 2017 | 65 | 2017 |