Water cycle algorithm–A novel metaheuristic optimization method for solving constrained engineering optimization problems H Eskandar, A Sadollah, A Bahreininejad, M Hamdi Computers & Structures 110, 151-166, 2012 | 1652 | 2012 |
Mine blast algorithm: A new population based algorithm for solving constrained engineering optimization problems A Sadollah, A Bahreininejad, H Eskandar, M Hamdi Applied Soft Computing 13 (5), 2592-2612, 2013 | 927 | 2013 |
Sustainable supplier selection: A ranking model based on fuzzy inference system A Amindoust, S Ahmed, A Saghafinia, A Bahreininejad Applied soft computing 12 (6), 1668-1677, 2012 | 756 | 2012 |
Damage detection of truss bridge joints using Artificial Neural Networks M Mehrjoo, N Khaji, H Moharrami, A Bahreininejad Expert Systems with Applications 35 (3), 1122-1131, 2008 | 410 | 2008 |
Mine blast algorithm for optimization of truss structures with discrete variables A Sadollah, A Bahreininejad, H Eskandar, M Hamdi Computers & Structures 102, 49-63, 2012 | 283 | 2012 |
Water cycle algorithm with evaporation rate for solving constrained and unconstrained optimization problems A Sadollah, H Eskandar, A Bahreininejad, JH Kim Applied Soft Computing 30, 58-71, 2015 | 231 | 2015 |
A context-aware adaptive learning system using agents M Yaghmaie, A Bahreininejad Expert Systems with Applications 38 (4), 3280-3286, 2011 | 156 | 2011 |
Water cycle, mine blast and improved mine blast algorithms for discrete sizing optimization of truss structures A Sadollah, H Eskandar, A Bahreininejad, JH Kim Computers & Structures 149, 1-16, 2015 | 143 | 2015 |
Water cycle algorithm for solving multi-objective optimization problems A Sadollah, H Eskandar, A Bahreininejad, JH Kim Soft Computing 19, 2587-2603, 2015 | 130 | 2015 |
A modified particle swarm optimization for solving the integrated location and inventory control problems in a two-echelon supply chain network SM Mousavi, A Bahreininejad, SN Musa, F Yusof Journal of intelligent manufacturing 28, 191-206, 2017 | 123 | 2017 |
Optimizing a location allocation-inventory problem in a two-echelon supply chain network: A modified fruit fly optimization algorithm SM Mousavi, N Alikar, STA Niaki, A Bahreininejad Computers & Industrial Engineering 87, 543-560, 2015 | 106 | 2015 |
GGWO: Gaze cues learning-based grey wolf optimizer and its applications for solving engineering problems MH Nadimi-Shahraki, S Taghian, S Mirjalili, H Zamani, A Bahreininejad Journal of Computational Science 61, 101636, 2022 | 91 | 2022 |
Neural computing for structural mechanics BHV Topping, A Bahreininejad (No Title), 1997 | 91 | 1997 |
Optimum gradient material for a functionally graded dental implant using metaheuristic algorithms A Sadollah, A Bahreininejad Journal of the mechanical behavior of biomedical materials 4 (7), 1384-1395, 2011 | 87 | 2011 |
Parallel processing, neural networks and genetic algorithms BHV Topping, J Sziveri, A Bahreinejad, JPB Leite, B Cheng Advances in Engineering Software 29 (10), 763-786, 1998 | 66 | 1998 |
Optimization process planning using hybrid genetic algorithm and intelligent search for job shop machining M Salehi, A Bahreininejad Journal of Intelligent Manufacturing 22, 643-652, 2011 | 65 | 2011 |
Optimization of laminate stacking sequence for minimizing weight and cost using elitist ant system optimization H Hemmatian, A Fereidoon, A Sadollah, A Bahreininejad Advances in engineering Software 57, 8-18, 2013 | 61 | 2013 |
On-line analysis of out-of-control signals in multivariate manufacturing processes using a hybrid learning-based model M Salehi, A Bahreininejad, I Nakhai Neurocomputing 74 (12-13), 2083-2095, 2011 | 61 | 2011 |
Two tuned multi-objective meta-heuristic algorithms for solving a fuzzy multi-state redundancy allocation problem under discount strategies SM Mousavi, N Alikar, STA Niaki, A Bahreininejad Applied Mathematical Modelling 39 (22), 6968-6989, 2015 | 53 | 2015 |
Weight optimization of truss structures using water cycle algorithm H Eskandar, A Sadollah, A Bahreininejad, K Lumpur International Journal of optimization in civil engineering 3 (1), 115-129, 2013 | 52 | 2013 |