PENERAPAN METODE FAST TRACK UNTUK PERCEPATAN WAKTU PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG ICU, ICCU DAN NICU RSU DR. SAIFUL ANWAR MALANG Kustamar, T Iskandar, E Winanto Jurnal Teknik Sipil INFO MANPRO 7 (1), 1-11, 2017 | 15 | 2017 |
Konservasi Mata Air Berbasis Partisipasi Masyarakat Di Kota Batu Jawa Timur Kustamar, B Parianom, G Sukowiyono, T Arniati Dinamika Teknik Sipil 10, 144-149, 2010 | 13 | 2010 |
THE POLLUTION INDEX AND CARRYING CAPACITY OF THE UPSTREAM BRANTAS RIVER KLK Wulandari1 Jurnal of GEOMATE 19 (73), 26 - 32, 2020 | 12* | 2020 |
Pengembangan Model Simulasi Penggunaan Lahan Untuk Mengendalikan Fluktuasi Debit Sungai Kustamar, B Suharto, Sumarno, W Budikusuma Jurnal Rekayasa, 1-15, 2009 | 8* | 2009 |
Development of the Conservative Village Model in the Upstream Brantas River K Kustamar, TH Nainggolan, A Witjaksono, A Utomo, LM Limantara International Journal of GEOMATE 15, 182-188, 2018 | 3 | 2018 |
PEMBUATAN BRONCAPTUR DAN TANDON AIR SEBAGAI UPAYA PENINGKATAN KUALITAS LAYANAN AIR BERSIH PEDESAAN Kustamar, Sudiro Prosiding SENIATI 3 (2), 33-1-6, 2017 | 3 | 2017 |
FAKTOR-FAKTOR YANG BERPENGARUH TERHADAP PERMINTAAN PERUMAHAN TIPE CLUSTER PADA PERUMAHAN PALEM ASRI DI KOTA JOMBANG Kustamar, T Iskandar, I Wijaya Jurnal Teknik Sipil INFO MANPRO 4 (1), 49-59, 2017 | 3 | 2017 |
ANALISIS WAKTU PENGENDALIAN PROYEK PEMBANGUNAN RUMAH SUSUN SEDERHANA SEWA (RUSUNAWA) DI KOTA PASURUAN JAWA TIMUR DENGAN METODE FAST TRACK Kustamar, E Hargono, DF Nurcahyo Jurnal Teknik Sipil INFO MANPRO 3 (1), 1-12, 2017 | 3 | 2017 |
Strategi Pengendalian Banjir di Kawasan Permukiman Padat K Kustamar, E Hargono, B Subakti Buletin Utama Teknik 14 (1), 1-5, 2018 | 2 | 2018 |
PENERAPAN LEAST COST ANALYSIS TERHADAP JADWAL DAN BIAYA KONSTRUKSI (STUDI KASUS PADA PEMBANGUNAN JEMBATAN ALOLAIN DI KABUPATEN NGADA) Kustamar, T Iskandar, K Patrisius Jurnal Teknik Sipil INFO MANPRO 1 (1), 39-49, 2017 | 2 | 2017 |
PENENTUAN SKALA PRIORITAS PEMILIHAN PERKERASAN PENINGKATAN JARINGAN JALAN DI PROPINSI KALIMANTAN UTARA DENGAN AHP Kustamar, S Azis, H Nurtanto Jurnal Teknik Sipil INFO MANPRO 6 (1), 14-24, 2017 | 2 | 2017 |
PENENTUAN SKALA PRIORITAS PEMELIHARAAN BERKALA JALAN DI KABUPATEN MALANG Kustamar, EHD Putranto, A Anita Jurnal Teknik Sipil INFO MANPRO 5 (1), 51-64, 2017 | 2 | 2017 |
Pengendalian banjir berbasis konservasi sumber daya air (bagian II) optimasi desain tubuh embung pengendali banjir K Kustamar CV. Dream Litera Buana, 2018 | 1 | 2018 |
Strategy to Increase Absorption Well Capaticy Kustamar International Journal of Technology and Sciences 1 (1), 2017 | 1 | 2017 |
PENURUNAN KANDUNGAN LOGAM BERAT PADA AIR LINDI DENGAN MEDIA ZEOLIT MENGGUNAKAN METODE BATCH DAN METODE KONTINYU LD Susanawati, B Suharto, K Kustamar Agrointek: Jurnal Teknologi Industri Pertanian 5 (2), 141-147, 2011 | 1 | 2011 |
Evaluation of Construction Implementation on Warehouse Receipt Building Using Time Cost Trade-off Analysis Method K Kustamar, S Aziz IJEM (International Journal Of Engineering And Management) 1 (2), 20-32, 2017 | | 2017 |
Mudflow utilization for construction materials of tertiary irrigation canal lining S Azis, K Kustamar AIP Conference Proceedings 1903 (1), 2017 | | 2017 |
Analysis of Construction Material Procurement Retardation on Sepaku-Petung Rigid Pavement Improvement Project in East Kalimantan Province R Nugraha, A Kustamar Asia Pacific Journal of Multidisciplinary Research 5 (4), 2017 | | 2017 |
STUDI PENENTUAN PRODUKTIVITAS TENAGA KERJA BETON BERTULANG TERHADAP SNI 2002 PADA PEMBANGUNAN JEMBATAN DI KABUPATEN MANGGARAI PROPINSI NUSA TENGGARA TIMUR Kustamar, EHD Putranto, SS Zaldy Jurnal Teknik Sipil INFO MANPRO 2 (1), 18-27, 2017 | | 2017 |
The Applicaton of Dynamic System for Unit Price of Labour Prediction in Water Resources Project Hirijanto, Kustamar International Journal of Engineering and Management 1 (1), 2017 | | 2017 |