A time window approach to simultaneous scheduling of machines and material handling system in an FMS Ü Bilge, G Ulusoy Operations Research 43 (6), 1058-1070, 1995 | 352 | 1995 |
A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles G Ulusoy, F Sivrikaya-Şerifoǧlu, Ü Bilge Computers & Operations Research 24 (4), 335-351, 1997 | 286 | 1997 |
A tabu search algorithm for parallel machine total tardiness problem Ü Bilge, F Kıraç, M Kurtulan, P Pekgün Computers & Operations Research 31 (3), 397-414, 2004 | 209 | 2004 |
Multi-mode resource constrained multi-project scheduling and resource portfolio problem U Beşikci, Ü Bilge, G Ulusoy European Journal of Operational Research 240 (1), 22-31, 2015 | 186 | 2015 |
Operational aircraft maintenance routing problem with remaining time consideration M Başdere, Ü Bilge European Journal of Operational Research 235 (1), 315-328, 2014 | 122 | 2014 |
A robust disaster preparedness model for effective and fair disaster response G Erbeyoğlu, Ü Bilge European Journal of Operational Research 280 (2), 479-494, 2020 | 105 | 2020 |
AGV systems with multi-load carriers: basic issues and potential benefits Ü Bilge, JMA Tanchoco Journal of Manufacturing Systems 16 (3), 159-174, 1997 | 101 | 1997 |
A tabu search algorithm for the single machine total weighted tardiness problem Ü Bilge, M Kurtulan, F Kıraç European Journal of Operational Research 176 (3), 1423-1435, 2007 | 95 | 2007 |
Simultaneous scheduling of machines and automated guided vehicles G Ulusoy, Ü Bilge The International Journal of Production Research 31 (12), 2857-2873, 1993 | 80 | 1993 |
Resource dedication problem in a multi-project environment U Beşikci, Ü Bilge, G Ulusoy Flexible Services and Manufacturing Journal 25, 206-229, 2013 | 70 | 2013 |
A hierarchical approach to FMS planning and control with simulation-based capacity anticipation E Albey, Ü Bilge International Journal of Production Research 49 (11), 3319-3342, 2011 | 50 | 2011 |
Robust supply chain network design with multi-products for a company in the food sector N Aras, Ü Bilge Applied mathematical modelling 60, 526-539, 2018 | 47 | 2018 |
An exploratory study of disaggregated clearing functions for production systems with multiple products E Albey, Ü Bilge, R Uzsoy International Journal of Production Research 52 (18), 5301-5322, 2014 | 45 | 2014 |
A parametric fuzzy logic approach to dynamic part routing under full routing flexibility Ü Bilge, M Fırat, E Albey Computers & Industrial Engineering 55 (1), 15-33, 2008 | 44 | 2008 |
Multi-attribute responsive dispatching strategies for automated guided vehicles Ü Bilge, G Esenduran, N Varol, Z Öztürk, B Aydın, A Alp International Journal of Production Economics 100 (1), 65-75, 2006 | 43 | 2006 |
Multi-dimensional clearing functions for aggregate capacity modelling in multi-stage production systems E Albey, Ü Bilge, R Uzsoy International Journal of Production Research 55 (14), 4164-4179, 2017 | 32 | 2017 |
Material handling considerations in the FMS loading problem with full routing flexibility D Koşucuoğlu, Ü Bilge International Journal of Production Research 50 (22), 6530-6552, 2012 | 25 | 2012 |
Facility layout problem with QAP formulation under scenario-based uncertainty M Şahinkoç, Ü Bilge INFOR: Information Systems and Operational Research 56 (4), 406-427, 2018 | 16 | 2018 |
PSO-based and SA-based metaheuristics for bilinear programming problems: an application to the pooling problem G Erbeyoğlu, Ü Bilge Journal of Heuristics 22, 147-179, 2016 | 14 | 2016 |
Simultaneous scheduling of machines and material handling system in an FMS G Ulusoy, Ü Bilge IFAC Proceedings Volumes 25 (8), 15-25, 1992 | 14 | 1992 |