A new heuristic method for the flow shop sequencing problem M Widmer, A Hertz European Journal of Operational Research 41 (2), 186-193, 1989 | 538 | 1989 |
Guidelines for the use of meta-heuristics in combinatorial optimization A Hertz, M Widmer European Journal of Operational Research 151 (2), 247-252, 2003 | 189 | 2003 |
Job shop scheduling with tooling constraints: a tabu search approach M Widmer Journal of the Operational Research Society 42 (1), 75-82, 1991 | 155 | 1991 |
A case study of single shift planning and scheduling under annualized hours: A simple three-step approach CS Azmat, M Widmer European Journal of Operational Research 153 (1), 148-175, 2004 | 102 | 2004 |
Mixed integer programming to schedule a single-shift workforce under annualized hours CS Azmat, T Hürlimann, M Widmer Annals of Operations Research 128, 199-215, 2004 | 89 | 2004 |
An improved tabu search approach for solving the job shop scheduling problem with tooling constraints A Hertz, M Widmer Discrete applied mathematics 65 (1-3), 319-345, 1996 | 63 | 1996 |
A flexible MILP model for multiple-shift workforce planning under annualized hours A Hertz, N Lahrichi, M Widmer European Journal of Operational Research 200 (3), 860-873, 2010 | 55 | 2010 |
Classification of drivers' workload using physiological signals in conditional automation Q Meteier, M Capallera, S Ruffieux, L Angelini, O Abou Khaled, ... Frontiers in psychology 12, 596038, 2021 | 50 | 2021 |
Metaheuristics for a scheduling problem with rejection and tardiness penalties S Thevenin, N Zufferey, M Widmer Journal of scheduling 18, 89-105, 2015 | 46 | 2015 |
Loading problems with tool management in flexible manufacturing systems: a few integer programming models D de Werra, M Widmer International Journal of Flexible Manufacturing Systems 3, 71-82, 1991 | 44 | 1991 |
Order acceptance and scheduling with earliness and tardiness penalties S Thevenin, N Zufferey, M Widmer Journal of Heuristics 22, 849-890, 2016 | 43 | 2016 |
Do not forget the breakdowns and the maintenance operations in FMS design problems! M Widmer, P Solot International Journal of Production Research 28 (2), 421-430, 1990 | 37 | 1990 |
Integer linear programming models for a cement delivery problem A Hertz, M Uldry, M Widmer European Journal of Operational Research 222 (3), 623-631, 2012 | 28 | 2012 |
Les métaheuristiques: des outils performants pour les problèmes industriels M Widmer Conception, analyse et gestion des sytèmes industriels (Troyes, 25-27 avril …, 2001 | 27 | 2001 |
Finding the adequate location scenario after the merger of fire brigades thanks to Multiple Criteria Decision Analysis Methods M Aldabbas, F Venteicher, L Gerber, M Widmer Foundations of computing and decision sciences 43 (2), 69-88, 2018 | 26 | 2018 |
Modèles mathématiques pour une gestion efficace des ateliers flexibles M Widmer EPFL Press, 1991 | 23 | 1991 |
Metaheuristics and scheduling M Widmer, A Hertz, D Costa Production scheduling, 33-68, 2008 | 22 | 2008 |
A new approach for solving the Flow Shop sequencing problem M Widmer, A Hertz European Journal of Operational Research 41, 186-193, 1989 | 22 | 1989 |
FUN: A dynamic method for scheduling problems B Bugnon, K Stoffel, M Widmer European Journal of Operational Research 83 (2), 271-282, 1995 | 19 | 1995 |
La méthode TABOU appliquée aux problèmes d'ordonnancement A Hertz, M Widmer Automatique-productique informatique industrielle 29 (4-5), 353-378, 1995 | 17 | 1995 |