A Pareto approach to multi-objective flexible job-shop scheduling problem using particle swarm optimization and local search G Moslehi, M Mahnam International Journal of Production Economics 129 (1), 14-22, 2011 | 452 | 2011 |
Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness G Moslehi, M Mirzaee, M Vasei, M Modarres, A Azaron International Journal of Production Economics 122 (2), 763-773, 2009 | 65 | 2009 |
Two-sided assembly line balancing considering the relationships between tasks D Khorasanian, SR Hejazi, G Moslehi Computers & Industrial Engineering 66 (4), 1096-1105, 2013 | 60 | 2013 |
Energy-efficient scheduling in an unrelated parallel-machine environment under time-of-use electricity tariffs H Saberi-Aliabad, M Reisi-Nafchi, G Moslehi Journal of Cleaner Production 249, 119393, 2020 | 55 | 2020 |
Optimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert R Tavakkoli-Moghaddam, G Moslehi, M Vasei, A Azaron Applied Mathematics and Computation 167 (2), 1430-1450, 2005 | 55 | 2005 |
Optimizing blocking flow shop scheduling problem with total completion time criterion G Moslehi, D Khorasanian Computers & Operations Research 40 (7), 1874-1883, 2013 | 54 | 2013 |
A hybrid variable neighborhood search algorithm for solving the limited-buffer permutation flow shop scheduling problem with the makespan criterion G Moslehi, D Khorasanian Computers & Operations Research 52, 260-268, 2014 | 51 | 2014 |
A hybrid genetic and linear programming algorithm for two-agent order acceptance and scheduling problem M Reisi-Nafchi, G Moslehi Applied Soft Computing 33, 37-47, 2015 | 42 | 2015 |
A Benders decomposition approach for order acceptance and scheduling problem: a robust optimization approach S Emami, G Moslehi, M Sabbagh Computational and applied mathematics 36, 1471-1515, 2017 | 40 | 2017 |
Minimizing the number of tardy jobs under piecewise-linear deterioration G Moslehi, A Jafari Computers & Industrial Engineering 59 (4), 573-584, 2010 | 37 | 2010 |
A Lagrangian relaxation algorithm for order acceptance and scheduling problem: a globalised robust optimisation approach S Emami, M Sabbagh, G Moslehi International Journal of Computer Integrated Manufacturing 29 (5), 535-560, 2016 | 36 | 2016 |
Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness M Mahnam, G Moslehi, SMTF Ghomi Mathematical and Computer Modelling 57 (9-10), 2549-2563, 2013 | 33 | 2013 |
A branch-and-bound algorithm for a single machine sequencing to minimize the sum of maximum earliness and tardiness with idle insert R Tavakkoli-Moghaddam, G Moslehi, M Vasei, A Azaron Applied Mathematics and Computation 174 (1), 388-408, 2006 | 32 | 2006 |
The re-planning and scheduling of surgical cases in the operating room department after block release time with resource rescheduling B Akbarzadeh, G Moslehi, M Reisi-Nafchi, B Maenhout European Journal of Operational Research 278 (2), 596-614, 2019 | 31 | 2019 |
A diving heuristic for planning and scheduling surgical cases in the operating room department with nurse re-rostering B Akbarzadeh, G Moslehi, M Reisi-Nafchi, B Maenhout Journal of scheduling 23, 265-288, 2020 | 30 | 2020 |
Robust scheduling of parallel machines considering total flow time S Alimoradi, M Hematian, G Moslehi Computers & Industrial Engineering 93, 152-161, 2016 | 29 | 2016 |
Scheduling linear deteriorating jobs to minimize the number of tardy jobs A Jafari, G Moslehi Journal of Global Optimization 54, 389-404, 2012 | 29 | 2012 |
A branch-and-bound algorithm to minimise the sum of maximum earliness and tardiness in the single machine G Moslehi, M Mahnam, M Amin-Nayeri, A Azaron International Journal of Operational Research 8 (4), 458-482, 2010 | 29 | 2010 |
A branch-and-bound algorithm for minimizing the sum of maximum earliness and tardiness with unequal release times M Mahnam, G Moslehi Engineering Optimization 41 (6), 521-536, 2009 | 27 | 2009 |
A branch-and-bound algorithm for single machine scheduling with quadratic earliness and tardiness penalties K Kianfar, G Moslehi Computers & Operations Research 39 (12), 2978-2990, 2012 | 26 | 2012 |