Image-based retrieval of concrete crack properties for bridge inspection RS Adhikari, O Moselhi, A Bagchi Automation in construction 39, 180-194, 2014 | 407 | 2014 |
Integrating 3D laser scanning and photogrammetry for progress measurement of construction work S El-Omari, O Moselhi Automation in construction 18 (1), 1-9, 2008 | 326 | 2008 |
Neural networks as tools in construction O Moselhi, T Hegazy, P Fazio Journal of construction engineering and management 117 (4), 606-625, 1991 | 308 | 1991 |
Developing practical neural network applications using back‐propagation T Hegazy, P Fazio, O Moselhi Computer‐Aided Civil and Infrastructure Engineering 9 (2), 145-159, 1994 | 256 | 1994 |
Optimizing resource utilization for repetitive construction projects K El-Rayes, O Moselhi Journal of construction engineering and management 127 (1), 18-27, 2001 | 242 | 2001 |
Integrating automated data acquisition technologies for progress reporting of construction projects S El-Omari, O Moselhi Automation in construction 20 (6), 699-705, 2011 | 236 | 2011 |
Change orders impact on labor productivity O Moselhi, I Assem, K El-Rayes Journal of Construction Engineering and Management 131 (3), 354-359, 2005 | 236 | 2005 |
Project-network analysis using fuzzy sets theory P Lorterapong, O Moselhi Journal of Construction Engineering and Management 122 (4), 308-318, 1996 | 225 | 1996 |
RFID indoor location identification for construction projects A Montaser, O Moselhi Automation in Construction 39, 167-179, 2014 | 200 | 2014 |
Scheduling of repetitive projects with cost optimization O Moselhi, K El-Rayes Journal of Construction Engineering and Management 119 (4), 681-697, 1993 | 172 | 1993 |
Resource-driven scheduling of repetitive activities K El-Rayes, O Moselhi Construction management & economics 16 (4), 433-446, 1998 | 171 | 1998 |
Impact of rainfall on the productivity of highway construction K El-Rayes, O Moselhi Journal of construction engineering and management 127 (2), 125-131, 2001 | 170 | 2001 |
Multiobjective optimization of earthmoving operations M Marzouk, O Moselhi Journal of construction Engineering and Management 130 (1), 105-113, 2004 | 169 | 2004 |
Schedule compression using the direct stiffness method O Moselhi Canadian Journal of Civil Engineering 20 (1), 65-72, 1993 | 165 | 1993 |
Classification of defects in sewer pipes using neural networks O Moselhi, T Shehab-Eldeen Journal of infrastructure systems 6 (3), 97-104, 2000 | 146 | 2000 |
Analogy-based solution to markup estimation problem T Hegazy, O Moselhi Journal of Computing in Civil Engineering 8 (1), 72-87, 1994 | 146 | 1994 |
DBID: Analogy-based DSS for bidding in construction O Moselhi, T Hegazy, P Fazio Journal of Construction Engineering and Management 119 (3), 466-479, 1993 | 146 | 1993 |
Optimization algorithm for selection and on site location of mobile cranes M Al-Hussein, S Alkass, O Moselhi Journal of construction engineering and management 131 (5), 579-590, 2005 | 138 | 2005 |
Prediction models for annual break rates of water mains Y Wang, T Zayed, O Moselhi Journal of performance of constructed facilities 23 (1), 47-54, 2009 | 133 | 2009 |
Object-oriented simulation model for earthmoving operations M Marzouk, O Moselhi Journal of construction engineering and management 129 (2), 173-181, 2003 | 130 | 2003 |