Survive IT! Survival analysis of IT project planning approaches ZT Kosztyán, R Jakab, G Novák, C Hegedűs Operations Research Perspectives 7, 100170, 2020 | 15 | 2020 |
Analysis and consequences on some aggregation functions of PRISM (partial risk Map) risk assessment method F Bognár, C Hegedűs Mathematics 10 (5), 676, 2022 | 14 | 2022 |
The consideration of measurement uncertainty in forecast and maintenance related decisions C Hegedűs, ZT Kosztyán Problems of Management in the 21st Century 1, 46, 2011 | 12 | 2011 |
Treating measurement uncertainty in industrial conformity control ZT Kosztyán, C Hegedűs, A Katona Central European Journal of Operations Research 25 (4), 907-928, 2017 | 11 | 2017 |
A matrix-based flexible project-planning library and indicators ZT Kosztyán, G Novák, R Jakab, I Szalkai, C Hegedűs Expert Systems with Applications 216, 119472, 2023 | 8 | 2023 |
Computer aided diagnostic methods to forecast condition-based maintenance tasks ZT Kosztyán, C Hegedűs Emerging Trends in Computing, Informatics, Systems Sciences, and Engineering …, 2013 | 8 | 2013 |
A mérési bizonytalanság kockázat alapú kezelése megfelelőség ZT KOSZTYÁN, C HEGEDŰS SZIGMA Matematikai-közgazdasági folyóirat 42 (1-2), 43-55, 2011 | 7 | 2011 |
Mérési bizonytalanság kezelése a mintavételes minőségszabályozásban H Cs, K Zs V. Jedlik Ányos Szakmai Napok, Veszprém, 27-29, 2008 | 6 | 2008 |
Kockázatalapú döntések támogatása a mérési bizonytalanság figyelembevételével C Hegedűs B. Beszteri, szerk. A Felfedező Tudomány. Győr: Széchenyi István Egyetem, p …, 2013 | 5 | 2013 |
Parameter drift in risk-based statistical control charts C Hegedus, ZT Kosztyán, A Katona AWERProcedia Information Technology & Computer Science 3, 1360-1366, 2013 | 5 | 2013 |
A kockázat-alapú döntések a mintavételes minőségellenőrzésben a mérési bizonytalanság figyelembe vételével C Hegedűs, G Vastag VEZETÉSTUDOMÁNY 44 (6), 66-73, 2013 | 3 | 2013 |
Handling Maintenance Projects with Matrix-Based Methods ZT Kosztyán, C Hegedűs, J Kiss, A Németh Emerging Trends in Computing, Informatics, Systems Sciences, and Engineering …, 2013 | 3 | 2013 |
A matrix-based flexible multi-level project planning library and indicators ZT Kosztyán, N Gergely, J Róbert, C Hegedűs DS 121: Proceedings of the 24th International DSM Conference (DSM 2022 …, 2022 | 2 | 2022 |
Risk-based decision support for conformity control under uncertainty C Hegedűs Global Journal on Technology 5, 78-84, 2014 | 2 | 2014 |
Kockázatalapú döntések támogatása a megfelelőség értékelésében a mérési bizonytalanság figyelembevételével= Risk-based decision support for conformity control considering … C Hegedűs Pannon Egyetem, 2014 | 2 | 2014 |
RISK-BASED CONSIDERATION OF MEASUREMENT UNCERTAINTY IN DECISIONS C HEGEDŰS Pannon Management Review 3 (3), 73-96, 2014 | 1 | 2014 |
Design of Risk-Based Univariate Control Charts with Measurement Uncertainty AI Katona, A Saghir, C Hegedűs, ZT Kosztyán IEEE Access, 2023 | | 2023 |
Mátrix-alapú projektkockázat-menedzsment ZT Kosztyán, C Hegedűs SZIGMA Matematikai-közgazdasági folyóirat 51 (3), 215-239, 2020 | | 2020 |
Matrix-based Evaluation of Project Management Approaches ZT Kosztyán, C Hegedűs | | 2017 |
Global Journal on Technology A Katona, C Hegedűs, ZT Kosztyán | | 2014 |