Minimizing tardiness and maintenance costs in flow shop scheduling by a lower-bound-based GA AJ Yu, J Seif Computers & Industrial Engineering 97, 26-40, 2016 | 78 | 2016 |
Planning and design models for construction industry: A critical survey BR Sarker, PJ Egbelu, TW Liao, J Yu Automation in Construction 22, 123-134, 2012 | 59 | 2012 |
Systems requirements engineering—State of the methodology Y Bijan, J Yu, J Stracener, T Woods Systems Engineering 16 (3), 267-276, 2013 | 57 | 2013 |
A multi-objective stochastic programming model for project-oriented human-resource management optimization F Rahmanniyay, AJ Yu International Journal of Management Science and Engineering Management 14 (4 …, 2019 | 41 | 2019 |
Directional decomposition heuristic for a linear machine-cell location problem J Yu, BR Sarker European Journal of Operational Research 149 (1), 142-184, 2003 | 40 | 2003 |
Manufacturing lot-sizing, procurement and delivery schedules over a finite planning horizon D Mungan, J Yu, BR Sarker International Journal of Production Research 48 (12), 3619-3636, 2010 | 39 | 2010 |
A two-phase procedure for duplicating bottleneck machines in a linear layout, cellular manufacturing system BR Sarker, J Yu The International Journal of Production Research 32 (9), 2049-2066, 1994 | 38 | 1994 |
Single-manufacturer, multi-retailer consignment policy for retailers’ generalized demand distributions J Yu, BR Sarker, Q Duan, B Wu Journal of the Operational Research Society 63 (12), 1708-1719, 2012 | 34 | 2012 |
An inkjet-printed capacitive sensor for water level or quality monitoring: investigated theoretically and experimentally Q Yang, JY Andrew, J Simonton, G Yang, Y Dohrmann, Z Kang, Y Li, J Mo, ... Journal of Materials Chemistry A 5 (34), 17841-17847, 2017 | 31 | 2017 |
Modelling and optimization of a bi-objective flow shop scheduling with diverse maintenance requirements J Seif, AJ Yu, F Rahmanniyay International Journal of Production Research 56 (9), 3204-3225, 2018 | 29 | 2018 |
A multi-objective multi-stage stochastic model for project team formation under uncertainty in time requirements F Rahmanniyay, AJ Yu, J Seif Computers & Industrial Engineering 132, 153-165, 2019 | 28 | 2019 |
An integrated multi-stage supply chain inventory model under an infinite planning horizon and continuous price decrease J Yu, D Mungan, BR Sarker Computers & Industrial Engineering 61 (1), 118-130, 2011 | 28 | 2011 |
Single machine common flow allowance group scheduling with learning effect and resource allocation L Sun, AJ Yu, B Wu Computers & Industrial Engineering 139, 106126, 2020 | 27 | 2020 |
Maximizing profit for vehicle routing under time and weight constraints J Yu, Y Dong International Journal of Production Economics 145 (2), 573-583, 2013 | 26 | 2013 |
Integrated preventive maintenance and flow shop scheduling under uncertainty J Seif, M Dehghanimohammadabadi, AJ Yu Flexible services and manufacturing journal 32, 852-887, 2020 | 24 | 2020 |
Procurement auctions and supply chain performance M Jin, AJ Yu International Journal of Production Economics 162, 192-200, 2015 | 19 | 2015 |
A numerical solution for a two-stage production and inventory system with random demand arrivals AJ Yu, Y Dong Computers & operations research 44, 13-21, 2014 | 19 | 2014 |
Configuration and operation architecture for dynamic cellular manufacturing product–service system B Wu, S Fan, AJ Yu, L Xi Journal of cleaner production 131, 716-727, 2016 | 17 | 2016 |
An extensive operations and maintenance planning problem with an efficient solution method J Seif, JY Andrew Computers & Operations Research 95, 151-162, 2018 | 16 | 2018 |
Incorporating a measure of uncertainty into systems of systems development performance measures R Volkert, J Stracener, J Yu Systems Engineering 17 (3), 297-312, 2014 | 12 | 2014 |