Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods DR Hale, PP Shrestha, GEJ Gibson, GC Migliaccio Journal of Construction Engineering and Management 135 (7), 579 - 587, 2009 | 425 | 2009 |
Data fusion of real-time location sensing and physiological status monitoring for ergonomics analysis of construction workers T Cheng, GC Migliaccio, J Teizer, UC Gatti Journal of Computing in Civil engineering 27 (3), 320-335, 2013 | 232 | 2013 |
Automated task-level activity analysis through fusion of real time location sensors and worker's thoracic posture data T Cheng, J Teizer, GC Migliaccio, UC Gatti Automation in Construction 29, 24-39, 2013 | 226 | 2013 |
Wearable sensors for monitoring on-duty and off-duty worker physiological status and activities in construction W Lee, KY Lin, E Seto, GC Migliaccio Automation in Construction 83, 341-353, 2017 | 180 | 2017 |
Physiological condition monitoring of construction workers UC Gatti, S Schneider, GC Migliaccio Automation in Construction 44, 227-233, 2014 | 152 | 2014 |
22 Public Private Partnerships in the US transportation sector AMA Aziz, GC Migliaccio Public Private Partnerships: A Global Review, 365, 2015 | 104* | 2015 |
Benchmarking of large design–build highway projects: One-to-one comparison and comparison with design–bid–build projects PP Shrestha, GC Migliaccio, JT O'Connor, GE Gibson Jr Transportation research record 1994 (1), 17-25, 2007 | 89 | 2007 |
Construction equipment management JE Schaufelberger, GC Migliaccio Routledge, 2019 | 87 | 2019 |
Workforce development: understanding task-level job demands-resources, burnout, and performance in unskilled construction workers W Lee, GC Migliaccio, KY Lin, EYW Seto Safety Science 123, 104577, 2020 | 86 | 2020 |
An evaluation of wearable sensors and their placements for analyzing construction worker's trunk posture in laboratory conditions W Lee, E Seto, KY Lin, GC Migliaccio Applied ergonomics 65, 424-436, 2017 | 86 | 2017 |
An exploratory study of the relationship between construction workforce physical strain and task level productivity UC Gatti, GC Migliaccio, SM Bogus, S Schneider Construction management and economics 32 (6), 548-564, 2014 | 86 | 2014 |
Training of low-literacy and low-English-proficiency Hispanic workers on construction fall fatality KY Lin, W Lee, R Azari, GC Migliaccio Journal of Management in Engineering 34 (2), 05017009, 2018 | 75 | 2018 |
Exploring the influence of system quality, information quality, and external service on BIM user satisfaction J Song, GC Migliaccio, G Wang, H Lu Journal of Management in Engineering 33 (6), 04017036, 2017 | 71 | 2017 |
Procurement of design-build services: Two-phase selection for highway projects GC Migliaccio, GE Gibson, JT O’connor Journal of management in engineering 25 (1), 29-39, 2009 | 53 | 2009 |
Changing project delivery strategy: An implementation framework GC Migliaccio, GE Gibson Jr, JT O'connor Public works management & policy 12 (3), 483-502, 2008 | 53 | 2008 |
Wearable physiological status monitors for measuring and evaluating workers’ physical strain: Preliminary validation UC Gatti, GC Migliaccio, S Schneider Computing in Civil Engineering 2011, 194-201, 2011 | 41 | 2011 |
Key Implementation Issues and Lessons Learned with Design-Build Projects GE Gibson, JT O'Connor, GC Migliaccio, J Walewski Alternative Project Delivery, Procurement, and Contracting Methods for …, 2007 | 41* | 2007 |
Study of the relationship between procurement duration and project performance in design-build projects: Comparison between water/wastewater and transportation sectors SM Bogus, GC Migliaccio, R Jin Journal of Management in Engineering 29 (4), 382-391, 2013 | 40 | 2013 |
Guide for design management on design-build and construction manager/general contractor projects E Minchin, L Ptschelinzew, GC Migliaccio, U Gatti, K Atkins, T Warne, ... NCHRP report, 2014 | 35 | 2014 |
Using workforce’s physiological strain monitoring to enhance social sustainability of construction U Gatti, G Migliaccio, SM Bogus, S Priyadarshini, A Scharrer Journal of architectural engineering 19 (3), 179-185, 2013 | 35 | 2013 |