Stochastic network models for logistics planning in disaster relief D Alem, A Clark, A Moreno European Journal of Operational Research 255 (1), 187-206, 2016 | 294 | 2016 |
Rolling-horizon lot-sizing when set-up times are sequence-dependent AR Clark, SJ Clark International Journal of Production Research 38 (10), 2287-2307, 2000 | 209 | 2000 |
An effective two-stage stochastic multi-trip location-transportation model with social concerns in relief supply chains A Moreno, D Alem, D Ferreira, A Clark European Journal of Operational Research 269 (3), 1050-1071, 2018 | 158 | 2018 |
Lot sizing and furnace scheduling in small foundries SA de Araujo, MN Arenales, AR Clark Computers & Operations Research 35 (3), 916-932, 2008 | 155 | 2008 |
Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups SA de Araujo, MN Arenales, AR Clark Journal of Heuristics 13, 337-358, 2007 | 150 | 2007 |
Lot sizing and sequencing optimisation at an animal-feed plant EAV Toso, R Morabito, AR Clark Computers & Industrial Engineering 57 (3), 813-821, 2009 | 147 | 2009 |
Editorial: Lot sizing and scheduling - industrial extensions and research opportunities A Clark, BA Lobo, C Almeder International Journal of Production Research 49 (9), 2457-2461, 0 | 110* | |
A survey of lot-sizing and scheduling models AT Staggemeier, A Clark | 107 | 2001 |
Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production D Ferreira, AR Clark, B Almada-Lobo, R Morabito International Journal of Production Economics 136 (2), 255-265, 2012 | 100 | 2012 |
Optimization approximations for capacity constrained material requirements planning AR Clark International Journal of Production Economics 84 (2), 115-131, 2003 | 97 | 2003 |
A heuristic method for lot-sizing in multi-stage systems PM França, VA Armentano, RE Berretta, AR Clark Computers & Operations Research 24 (9), 861-874, 1997 | 89 | 1997 |
Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups AA Menezes, A Clark, B Almada-Lobo Journal of Scheduling 14, 209-219, 2011 | 79 | 2011 |
A network transshipment model for planning humanitarian relief operations after a natural disaster A Clark, B Culkin Decision aid models for disaster management and emergencies, 233-257, 2013 | 75 | 2013 |
Production setup-sequencing and lot-sizing at an animal nutrition plant through atsp subtour elimination and patching AR Clark, R Morabito, EAV Toso Journal of scheduling 13, 111-121, 2010 | 74 | 2010 |
A heuristic for a resource-capacitated multi-stage lot-sizing problem with lead times AR Clark, VA Armentano Journal of the Operational research Society 46 (10), 1208-1222, 1995 | 71 | 1995 |
Hybrid heuristics for planning lot setups and sizes AR Clark Computers & Industrial Engineering 45 (4), 545-562, 2003 | 59 | 2003 |
Rolling horizon heuristics for production planning and set-up scheduling with backlogs and error-prone demand forecasts AR Clark Production Planning & Control 16 (1), 81-97, 2005 | 52 | 2005 |
Rescheduling nursing shifts: scoping the challenge and examining the potential of mathematical model based tools A Clark, P Moule, A Topping, M Serpell Journal of Nursing Management 23 (4), 411-420, 2015 | 49 | 2015 |
Production lot sizing and scheduling with non-triangular sequence-dependent setup times A Clark, M Mahdieh, S Rangel International Journal of Production Research 52 (8), 2490-2503, 2014 | 42 | 2014 |
Dimensionamento de lotes e programação do forno numa fundição de pequeno porte SA Araujo, MN Arenales, AR Clark Gestão & Produção 11, 165-176, 2004 | 42 | 2004 |