Critical evaluation of off-site construction research: A Scientometric analysis MR Hosseini, I Martek, EK Zavadskas, AA Aibinu, M Arashpour, ... Automation in construction 87, 235-247, 2018 | 552 | 2018 |
Critical success factors (CSFs) for integration of sustainability into construction project management practices in developing countries S Banihashemi, MR Hosseini, H Golizadeh, S Sankaran International journal of project management 35 (6), 1103-1119, 2017 | 505 | 2017 |
Artificial intelligence in the AEC industry: Scientometric analysis and visualization of research activities A Darko, APC Chan, MA Adabre, DJ Edwards, MR Hosseini, EE Ameyaw Automation in construction 112, 103081, 2020 | 434 | 2020 |
Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review M Oraee, MR Hosseini, E Papadonikolaki, R Palliyaguru, M Arashpour International journal of project management 35 (7), 1288-1301, 2017 | 422 | 2017 |
Collaboration barriers in BIM-based construction networks: A conceptual model M Oraee, MR Hosseini, DJ Edwards, H Li, E Papadonikolaki, D Cao International Journal of Project Management 37 (6), 839-854, 2019 | 268 | 2019 |
A survey of the factors affecting the productivity of construction projects in Iran P Ghoddousi, MR Hosseini Technological and economic development of economy 18 (1), 99-116, 2012 | 255 | 2012 |
Integrated project delivery with blockchain: An automated financial system F Elghaish, S Abrishami, MR Hosseini Automation in construction 114, 103182, 2020 | 231 | 2020 |
BIM adoption within Australian Small and Medium-sized Enterprises (SMEs): an innovation diffusion model MR Hosseini, S Banihashemi, N Chileshe, MO Namzadi, C Udaeja, ... Construction Economics and Building 16 (3), 71-86, 2016 | 214 | 2016 |
Causes of delays on construction projects: a comprehensive list S Durdyev, MR Hosseini International journal of managing projects in business 13 (1), 20-46, 2020 | 211 | 2020 |
Combination of dispersive liquid–liquid microextraction with flame atomic absorption spectrometry using microsample introduction for determination of lead in water samples MT Naseri, P Hemmatkhah, MRM Hosseini, Y Assadi Analytica chimica acta 610 (1), 135-141, 2008 | 207 | 2008 |
Patterns and trends in Internet of Things (IoT) research: future applications in the construction industry A Ghosh, DJ Edwards, MR Hosseini Engineering, Construction and Architectural Management 28 (2), 457-481, 2021 | 195 | 2021 |
A review on renewable energy transition in Australia: An updated depiction HX Li, DJ Edwards, MR Hosseini, GP Costin Journal of cleaner production 242, 118475, 2020 | 195 | 2020 |
Rebar corrosion detection, protection, and rehabilitation of reinforced concrete structures in coastal environments: A review A James, E Bazarchi, AA Chiniforush, PP Aghdam, MR Hosseini, ... Construction and Building Materials 224, 1026-1039, 2019 | 167 | 2019 |
Reverse logistics in the construction industry MR Hosseini, R Rameezdeen, N Chileshe, S Lehmann Waste Management & Research 33 (6), 499-514, 2015 | 164 | 2015 |
Analysis of citation networks in building information modeling research MR Hosseini, M Maghrebi, A Akbarnezhad, I Martek, M Arashpour Journal of construction engineering and management 144 (8), 04018064, 2018 | 158 | 2018 |
Factors driving the implementation of reverse logistics: A quantified model for the construction industry N Chileshe, R Rameezdeen, MR Hosseini, I Martek, HX Li, ... Waste management 79, 48-57, 2018 | 149 | 2018 |
Integration of parametric design into modular coordination: A construction waste reduction workflow S Banihashemi, A Tabadkani, MR Hosseini Automation in Construction 88, 1-12, 2018 | 144 | 2018 |
Drivers for adopting reverse logistics in the construction industry: a qualitative study N Chileshe, R Rameezdeen, MR Hosseini Engineering, Construction and Architectural Management 23 (2), 134-157, 2016 | 141 | 2016 |
Barriers to implementing reverse logistics in South Australian construction organisations N Chileshe, R Rameezdeen, MR Hosseini, S Lehmann Supply chain management: an international journal 20 (2), 179-204, 2015 | 140 | 2015 |
Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction M Arashpour, R Wakefield, EWM Lee, R Chan, MR Hosseini International Journal of Project Management 34 (7), 1393-1402, 2016 | 136 | 2016 |