关注
Chimay Anumba
标题
引用次数
引用次数
年份
Knowledge management in UK construction: Strategies, resources and barriers
P Carrillo, H Robinson, A Al-Ghassani, C Anumba
Project management journal 35 (1), 46-56, 2004
726*2004
Radio-Frequency Identification (RFID) applications: A brief introduction
K Domdouzis, B Kumar, C Anumba
Advanced Engineering Informatics 21 (4), 350-355, 2007
6252007
KPIs: a critical appraisal of their use in construction
S Beatham, C Anumba, T Thorpe, I Hedges
Benchmarking: an international journal 11 (1), 93-117, 2004
4682004
Knowledge management in the architecture, engineering and construction industry
JM Kamara, G Augenbroe, CJ Anumba, PM Carrillo
Construction innovation 2 (1), 53-67, 2002
4042002
A CLEVER approach to selecting a knowledge management strategy
JM Kamara, CJ Anumba, PM Carrillo
International journal of project management 20 (3), 205-211, 2002
4012002
STEPS: a knowledge management maturity roadmap for corporate sustainability
HS Robinson, CJ Anumba, PM Carrillo, AM Al‐Ghassani
Business Process Management Journal 12 (6), 793-808, 2006
3572006
Mapping between BIM and 3D GIS in different levels of detail using schema mediation and instance comparison
Y Deng, JCP Cheng, C Anumba
Automation in Construction 67, 1-21, 2016
3072016
Knowledge management practices in large construction organisations
HS Robinson, PM Carrillo, CJ Anumba, AM Al‐Ghassani
Engineering, Construction and Architectural Management 12 (5), 431-445, 2005
2812005
An integrated framework for concurrent life-cycle design and construction
NFO Evbuomwan, CJ Anumba
Advances in engineering software 29 (7-9), 587-597, 1998
2801998
An integrated system for change management in construction
IA Motawa, CJ Anumba, S Lee, F Peña-Mora
Automation in construction 16 (3), 368-377, 2007
2562007
Mobile ICT support for construction process improvement
S Bowden, A Dorr, T Thorpe, C Anumba
Automation in construction 15 (5), 664-676, 2006
2462006
A review of life cycle assessment of buildings using a systematic approach
MN Nwodo, CJ Anumba
Building and Environment 162, 106290, 2019
2452019
Capturing client requirements in construction projects
JM Kamara, CJ Anumba, NFO Evbuomwan
Thomas Telford, 2002
2432002
Ubiquitous location tracking for context-specific information delivery on construction sites
AH Behzadan, Z Aziz, CJ Anumba, VR Kamat
Automation in construction 17 (6), 737-748, 2008
2402008
Collaborative design of structures using intelligent agents
CJ Anumba, OO Ugwu, L Newnham, A Thorpe
Automation in construction 11 (1), 89-103, 2002
2352002
Organisational structures to support concurrent engineering in construction
CJ Anumba, C Baugh, MMA Khalfan
Industrial management & data systems 102 (5), 260-270, 2002
2122002
Concurrent engineering in design-build projects
CJ Anumba, NFO Evbuomwan
Construction Management & Economics 15 (3), 271-281, 1997
2031997
Establishing and processing client requirements—a key aspect of concurrent engineering in construction
JM Kamara, CJ Anumba, NFO Evbuomwan
Engineering, Construction and Architectural Management 7 (1), 15-28, 2000
1942000
Electronic commerce in construction—trends and prospects
CJ Anumba, K Ruikar
Automation in construction 11 (3), 265-275, 2002
1752002
VERDICT—An e-readiness assessment application for construction companies
K Ruikar, CJ Anumba, PM Carrillo
Automation in construction 15 (1), 98-110, 2006
1732006
系统目前无法执行此操作,请稍后再试。
文章 1–20