Supporting constructability analysis meetings with Immersive Virtual Reality-based collaborative BIM 4D simulation
C Boton
Automation in Construction 96, 1-15, 2018
1842018
The challenge of level of development in 4D/BIM simulation across AEC project lifecyle. A case study
C Boton, S Kubicki, G Halin
Procedia Engineering 123, 59-67, 2015
1052015
An innovative framework of 5D BIM solutions for construction cost management: a systematic review
MA Vigneault, C Boton, HY Chong, B Cooper-Cooke
Archives of Computational Methods in Engineering 27, 1013-1030, 2020
962020
What is at the Root of Construction 4.0: A systematic review of the recent research effort
C Boton, L Rivest, O Ghnaya, M Chouchen
Archives of Computational Methods in Engineering 28, 2331-2350, 2021
852021
Practices and processes in BIM projects: an exploratory case study
C Boton, D Forgues
Advances in civil engineering 2018 (1), 7259659, 2018
762018
Designing adapted visualization for collaborative 4D applications
C Boton, S Kubicki, G Halin
Automation in Construction 36, 152-167, 2013
732013
A parametric BIM approach to foster bridge project design and analysis
A Girardet, C Boton
Automation in Construction 126, 103679, 2021
682021
Fire safety in tall timber building: A BIM-based automated code-checking approach
K Kincelova, C Boton, P Blanchet, C Dagenais
Buildings 10 (7), 121, 2020
582020
Comparing PLM and BIM from the product structure standpoint
C Boton, L Rivest, D Forgues, J Jupp
Product Lifecycle Management for Digital Transformation of Industries: 13th …, 2016
462016
A framework for Building Information Modeling implementation in engineering education
C Boton, D Forgues, G Halin
Canadian Journal of Civil Engineering 45 (10), 866-877, 2018
392018
The need for a new systemic approach to study collaboration in the construction industry
C Boton, D Forgues
Procedia engineering 196, 1043-1050, 2017
312017
Comparison of shipbuilding and construction industries from the product structure standpoint
C Boton, L Rivest, D Forgues, JR Jupp
International Journal of Product Lifecycle Management 11 (3), 191-220, 2018
292018
Maturité des pratiques BIM: Dimensions de modélisation, pratiques collaboratives et technologies
C Boton, S Kubicki
SCAN'14, 6ème Séminaire de Conception Architecturale Numérique, 45-56, 2014
292014
Challenges of big data in the age of building information modeling: a high-level conceptual pipeline
C Boton, G Halin, S Kubicki, D Forgues
Cooperative Design, Visualization, and Engineering: 12th International …, 2015
262015
Top Down vs. Bottom Up Approaches Regarding the Implementation of Lean Construction Through a French Case Study
F Berroir, L Harbouche, C Boton
23rd Annual Conference of the International Group for Lean Construction, 73-82, 2015
242015
4D/BIM simulation for pre-construction and construction scheduling. Multiple levels of development within a single case study
C Boton, S Kubicki, G Halin
Diamond Congress Ltd, 2015
222015
Remote teaching of building information modeling during the COVID-19 pandemic: A case study
C Boton
Sustainability 12 (20), 8665, 2020
212020
The Potential of 4D Modelling Software Systems for Risk Management in Construction Projects
AM Musa, H Abanda, AH Oti, JHM Tah, C Boton
CIB World Building Congress 5, 988-999, 2016
192016
Conception de vues métiers dans les collecticiels orientés service. Vers des multi-vues adaptées pour la simulation collaborative 4D/nD de la construction
C Boton
Université de Lorraine, 2013
19*2013
Investigating the challenges related to combining BIM and Last Planner System on construction sites
C Boton, Y Pitti, D Forgues, I Iordanova
Frontiers of Engineering Management 8, 172-182, 2021
182021