Building for the period of 2016 and 2016 (Multi Years Contract). In practice, the design
structure faced today at the depth of the pile which was originally 12 meters to 9 meters.
Changes occur because the pile has reached the point of land when it reaches a depth of 9
meters (not yet up to 12 meters). Changes like this of course also affect the cost and time of
project implementation. The purpose of this study is to determine how much cost is required …