concerned with the Real and Reactive power rescheduling problem in a deregulated market
environment. The aim of the proposed work is to minimize deviations from transaction
schedules and hence the congestion cost. The TCSC maximizes the power transfer
capability between a specific power seller and a power buyer in a network. The TCSC is
installed in the most congested lines and analyzed. The method is formulated as a …