(BTB) converters in a power grid as a remedial action to reduce fault current levels. A hybrid
GA-Tabu search method was used to determine the best locations from a pre-selected list of
candidate locations. Additional constraints used to determine the best locations include bus
fault levels, feasibility of N-1 contingencies, and proximity of proposed locations. Simulations
of the search method were performed on the Korean power network, with candidate …