operator in order to operate the system in a reliable and optimal manner. In this paper,
machine learning with artificial neural network is used for forecasting the load at a particular
hour of the day on an electric power substation. Historical load data at each hour of the day
for the period from September-2018 to November-2018 is taken from 33/11 kV substation
near Kakatiya University in Warangal. A new artificial neural network architecture is …