when this grid is connected to the utility. However, when this grid is islanded, the capacitor
bank will be needed for induction generator operation. If a great capacitance is permanently
connected, it may cause a severe over-voltage due to ferroresonance. In this work, a
simulation approach is made for reselecting an adequate size of this capacitor that will not
cause this abnormal phenomenon in the islanded power grid. The obtained simulation …