result of high sedimentation, the navigational channel to the Haldia Port is maintained with
great amount of dredging (25 MCM per Annum). The paper presents a study carried out to
find a solution to improve the channel depth together with minimum maintenance dredging.
A desk study was carried out to identify the historical formation of the estuary and the
remedial measures implemented in the past. A detailed field investigation was carried out to …