[PDF][PDF] On the train timetabling problem and heuristics

E Pinheiro, E Miranda, A Oliveira - Brazilian Symposium of Operation …, 2016 - din.uem.br
E Pinheiro, E Miranda, A Oliveira
Brazilian Symposium of Operation Research, 2016din.uem.br
Freight railways are the major means of transportation of bulk material, such as iron ore from
the origin to the destination. Usually for heavy haul railways, the detination is a port. To
improve profit and ensure the quality of services of a railway, a good timetable design is
crucial. However, all the work provided on the Train Timetable Problem, an NP-hard
problem, is usually only applied locally to a single railway. This article deals with the train
timetabling problem applied to mixed traffic railways with both cargo trains and passenger …
Abstract
Freight railways are the major means of transportation of bulk material, such as iron ore from the origin to the destination. Usually for heavy haul railways, the detination is a port. To improve profit and ensure the quality of services of a railway, a good timetable design is crucial. However, all the work provided on the Train Timetable Problem, an NP-hard problem, is usually only applied locally to a single railway. This article deals with the train timetabling problem applied to mixed traffic railways with both cargo trains and passenger trains sharing the same resources with different priorities. Moreover, a public base benchmark of problems is proposed so that future work can be compared. This base is used to show that the problem cannot be solved to optimality within a reasonable time frame for production sized instances, and a genetic algorithm is proposed.
din.uem.br
以上显示的是最相近的搜索结果。 查看全部搜索结果