optimization methodology applied to a production line from a secondary manufacturing
wood processing plant of a well known Chilean mill. For this reason a simulation model
constructed in ARENA, was integrated to a genetic algorithm heuristic. The results obtained
show that using a different configuration of the plant resources, it is possible to reduce the
total average cycle time in 18%. The resource configuration needed to reach this result was …