Productivity improvement in the wood industry using simulation and artificial intelligence

FF Baesler, M Moraga, FJ Ramis - Proceedings of the Winter …, 2002 - ieeexplore.ieee.org
FF Baesler, M Moraga, FJ Ramis
Proceedings of the Winter Simulation Conference, 2002ieeexplore.ieee.org
The objective of this article is to present the results obtained after using a simulation
optimization methodology applied to a production line from a secondary manufacturing
wood processing plant of a well known Chilean mill. For this reason a simulation model
constructed in ARENA, was integrated to a genetic algorithm heuristic. The results obtained
show that using a different configuration of the plant resources, it is possible to reduce the
total average cycle time in 18%. The resource configuration needed to reach this result was …
The objective of this article is to present the results obtained after using a simulation optimization methodology applied to a production line from a secondary manufacturing wood processing plant of a well known Chilean mill. For this reason a simulation model constructed in ARENA, was integrated to a genetic algorithm heuristic. The results obtained show that using a different configuration of the plant resources, it is possible to reduce the total average cycle time in 18%. The resource configuration needed to reach this result was obtained evaluating just 1.6% of the total number of possible combinations.
ieeexplore.ieee.org
以上显示的是最相近的搜索结果。 查看全部搜索结果

Google学术搜索按钮

example.edu/paper.pdf
搜索
获取 PDF 文件
引用
References