Risk-based allocation of automation devices in distribution networks with performance-based regulation of continuity of supply

ZN Popovic, SD Knezevic… - IEEE Transactions on …, 2018 - ieeexplore.ieee.org
ZN Popovic, SD Knezevic, DS Popović
IEEE Transactions on Power Systems, 2018ieeexplore.ieee.org
This paper presents a risk-based procedure for obtaining the best network automation
scenario in the presence of uncertainty in distribution networks where performance-based
regulation of continuity of supply is used. The proposed approach takes into account the
uncertainty in loads, failure rates, and interruption duration. It employs fuzzy sets, fuzzy
mixed integer linear programming algorithm, and a tool for managing risk to determine the
optimal number, type and location of different types of automation devices in the presence of …
This paper presents a risk-based procedure for obtaining the best network automation scenario in the presence of uncertainty in distribution networks where performance-based regulation of continuity of supply is used. The proposed approach takes into account the uncertainty in loads, failure rates, and interruption duration. It employs fuzzy sets, fuzzy mixed integer linear programming algorithm, and a tool for managing risk to determine the optimal number, type and location of different types of automation devices in the presence of the aforementioned uncertainty. The presented approach considers performance-based (reward/penalty) schemes for an extended group of network reliability indices (SAIFI, SAIDI, MAIFI, and ASIDI) along with the cost of new automation devices and cost of relocation of the existing devices.
ieeexplore.ieee.org
以上显示的是最相近的搜索结果。 查看全部搜索结果