We pose a contingency analysis problem using a nonlinear optimization framework, which
enables us to detect the fewest possible transmission line outages resulting in a system
failure of specified severity, and to identify the most severe system failure caused by
removing a specified number of transmission lines from service. Illustrations using a three-
bus system and the IEEE 30-bus system aim to exhibit the effectiveness of the proposed …