[PDF][PDF] Status of the PITZ facility upgrade

A Oppelt, K Abrahamyan, G Asova, J Bähr… - Proceedings of the …, 2006 - researchgate.net
A Oppelt, K Abrahamyan, G Asova, J Bähr, G Dimitrov, HJ Grabosch, L Hakobyan…
Proceedings of the LINAC2006, Knoxville, TN, USA, 2006researchgate.net
The upgrade of the Photo Injector Test Facility at DESY in Zeuthen towards the PITZ2 stage
is continuously ongoing. In Spring 2006, a new intermediate stage was taken into operation
(PITZ1. 6), including a new gun cavity that has been tuned and commissioned. Three new
emittance measurement systems were installed along the beamline. Together with the
available booster cavity, they allow to study the emittance conservation principle. In the
paper, the results of the high power run in autumn 2006, and the results of the …
Abstract
The upgrade of the Photo Injector Test Facility at DESY in Zeuthen towards the PITZ2 stage is continuously ongoing. In Spring 2006, a new intermediate stage was taken into operation (PITZ1. 6), including a new gun cavity that has been tuned and commissioned. Three new emittance measurement systems were installed along the beamline. Together with the available booster cavity, they allow to study the emittance conservation principle. In the paper, the results of the high power run in autumn 2006, and the results of the commissioning of the new gun will be presented. The ongoing developments of further new diagnostics components for the PITZ2 phase will be discussed as well.
researchgate.net