Simulation of a construction project: assessing impact of just-in-time and lean principles

F Bamana, N Lehoux, C Cloutier - Journal of Construction …, 2019 - ascelibrary.org
… in Construction Although prefabrication might not be conducive to all construction projects, …
in this research concerns the construction of a medium-sized wooden building. Wood is …

Just-in-time application and implementation for building material management

A Akintoye - Construction management and economics, 1995 - Taylor & Francis
… JIT application to building material management should … frequent deliveries to the construction
site just in time for usage. … in a construction process must be known by site workforce. The …

Critical factors for successful implementation of just-in-time concept in modular integrated construction: A systematic review and meta-analysis

M Hussein, T Zayed - Journal of cleaner production, 2021 - Elsevier
… Hence, MiC modules need to be delivered to the construction site on-time with the required
quality and quantity. As a result, just-in-time (JIT), a lean construction technique, has been …

[PDF][PDF] The application of the just-in-time philosophy in the Chinese construction industry

LS Pheng, G Shang - … of construction in developing countries, 2011 - eprints.usm.my
construction site, access time needs to be monitored and ensured so that resources can be
utilised at the right time, … requires construction clients to enhance on-site supervision. The on-…

[HTML][HTML] BIM-integrated construction operation simulation for just-in-time production management

WS Jeong, S Chang, JW Son, JS Yi - Sustainability, 2016 - mdpi.com
… Due to the increasing size and complexity of construction projects, traditional construction
planning is no longer sufficient for producing workable plans that incorporate all necessary …

Just‐in‐time management in precast concrete construction: a survey of the readiness of main contractors in Singapore

L Sui Pheng, C Joo Chuan - Integrated Manufacturing Systems, 2001 - emerald.com
Just‐In‐Time (JIT) philosophy holds tremendous potentials for improving the movement of
precast concrete components from the prefabrication yard to, and within, the construction site. …

[PDF][PDF] More just-in-time: Location of buffers in structural steel supply and construction processes

ID Tommelein, M Weissenberger - Proceedings IGLC, 1999 - academia.edu
… The term ‘Just-In-Time’ (JIT), used for instance to describe the delivery of materials to a
construction site, suggests that materials will be brought to their location for final installation and …

Just-in-time management of precast concrete components

LS Pheng, CJ Chuan - … construction engineering and management, 2001 - ascelibrary.org
… : The just-in-time (JIT) philosophy has tremendous potential for managing the movement of
precast concrete components from the prefabrication yard to, and within, the construction site. …

How 'just-in-time'wastages can be quantified: case study of a private condominium project

LS Pheng, SKL Tan - Construction Management & Economics, 1998 - Taylor & Francis
works in this case study are very serious forms of time wastage. Hence, in applying the JIT
concept to this project, … so as to cut down on rectiŽcation works. In addition, management may …

Sustainable performance of just-in-time (JIT) management in time-dependent batch delivery scheduling of precast construction

L Kong, H Li, H Luo, L Ding, X Zhang - Journal of cleaner production, 2018 - Elsevier
… However, the more precast components delivered to the construction site in one time, the
longer the truck drivers have to queue for assembly. This is then accompanied by …