Stability measure for prefab balancing in prefabrication construction supply chain management

W Zhang, C Yu, RY Zhong - Computers & Industrial Engineering, 2023 - Elsevier
Effective management of the prefabrication construction supply chain management
(PCSCM) requires careful consideration of rational resource allocation and Just-in-Time …

A Dynamic Just‐in‐Time Component Delivery Framework for Off‐Site Construction

T Si, HX Li, Z Lei, H Liu, SH Han - Advances in Civil …, 2021 - Wiley Online Library
Off‐site construction entails various advantages compared with the traditional construction
method; however, the fragmentation of the prefabrication and assembly results in a complex …

Dynamic transportation planning for prefabricated component supply chain

H Zhang, L Yu - Engineering, Construction and Architectural …, 2020 - emerald.com
Purpose Prefabricated construction concerns off-site production, multi-mode transportation
and on-site installation of the prefabricated components, which are interdependent and …

Supply chain management for prefabricated building projects in Hong Kong

L Luo, X Jin, GQ Shen, Y Wang, X Liang… - … of management in …, 2020 - ascelibrary.org
Prefabricated building projects (PBPs) have gained worldwide popularity over the past few
decades because of their various benefits. Supply chain management (SCM) is critical to the …

Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints

J Liu, M Lu - Journal of construction engineering and management, 2018 - ascelibrary.org
With increasing implementation of off-site prefabrication and modular construction
technologies, the complexity of material supply chain management on construction projects …

Sustainable performance of just-in-time (JIT) management in time-dependent batch delivery scheduling of precast construction

L Kong, H Li, H Luo, L Ding, X Zhang - Journal of cleaner production, 2018 - Elsevier
Despite a great deal of research into precast production scheduling published in academic
journals worldwide, little attention has been given to environmental performance related to …

Collaborative scheduling of on-site and off-site operations in prefabrication

W Chen, Y Zhao, Y Yu, K Chen, M Arashpour - Sustainability, 2020 - mdpi.com
As a kind of sustainable technology, prefabricated construction has increasingly gained
momentum internationally due to its numerous benefits that include, but are not limited to …

Material delivery problems in construction projects: A possible solution

T Ala-Risku, M Kärkkäinen - International Journal of Production Economics, 2006 - Elsevier
Emerging project management methods for construction projects generate new kinds of
challenges for the delivery process of materials. The rationale of such methods is to create …

Scheduling optimization of prefabricated buildings under resource constraints

W He, W Li, X Meng - KSCE Journal of Civil Engineering, 2021 - Springer
Different from traditional construction project management, the prefabricated building (PB)
engineering has a complicated restricted relationship in scheduling scheme, and the entire …

Multi-period hedging and coordination in a prefabricated construction supply chain

Y Zhai, Y Fu, G Xu, G Huang - International Journal of Production …, 2019 - Taylor & Francis
In this paper, a multi-period buffer space hedging coordination between a building
contractor (BC) and a logistics provider (LP) is investigated. In order to facilitate the …